My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> CLEANING <br /> PART 1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> Execute cleaning , during progress of the work , and at completion of the work , as <br /> required by General conditions . <br /> 1 . 02 DISPOSAL REQUIREMENTS <br /> Conduct cleaning and disposal operations to comply y with codes , ordinances , <br /> regulations , and anti -pollution laws . <br /> PART 2 -- PRODUCTS <br /> 2 . 01 MATERIALS <br /> A. Use only those cleaning materials which will not create hazards to health <br /> or property and which will not damage finishes and surfaces . <br /> B . Use only those cleaning materials and methods recommended by <br /> manufacturer of the surface material to be cleaned . <br /> C . Use cleaning materials only on surfaces recommended by cleaning <br /> material manufacturer. <br /> PART 3 -- EXECUTION <br /> 3 .01 DURING CONSTRUCTION <br /> A. Execute periodic cleaning to keep the work , the site , and adjacent <br /> properties free from accumulation of waste materials , rubbish , and <br /> windblown debris resulting from construction operations . <br /> B . Dispose of waste materials , cartons , crating , debris , and rubbish at <br /> designated waste receptacles . <br /> C . Contractor shall maintain a broom -cleaned site during the entire <br /> construction phase . <br /> D . For exterior utility work (such as underground pipelines , roadways , <br /> service areas , etc. ) , these shall be cleaned daily. Not less frequently than <br /> once weekly . Roadways shall be mechanically broomed . <br /> 01710 - 1 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01710 Cleaning.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.