My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Number of original signed copies requires : Two each . <br /> C . Table of Contents : Neatly typed , in orderly sequence . Provide complete <br /> information for each item . <br /> 1 . Product or work item <br /> 2 . Firm , with name of principal , address , and telephone number. <br /> 3 . Scope . <br /> '� 4 . Date of beginning of warranty , bond or service and maintenance <br /> contract. <br /> 5 . Duration of warranty, bond or service maintenance contract. <br /> 6 . Provide information for Owner's personnel : <br /> a . Proper procedure in case of failure <br /> b . Instances which might affect the validity of warranty bonds . <br /> 7 . Contractor, name of responsible principal , address and telephone <br /> number. <br /> 1 . 04 FORM OF SUBMITTALS <br /> A. Prepare in duplicate packets . <br /> B . Format : <br /> 1 . Size 8- 1 /2" X 11 " punched sheets for 3-ring binder <br /> a . Fold larger sheets to fit into binders <br /> 2 . Cover: Identify each packet with typed or printed title <br /> "WARRANTIES AND BONDS . " List: <br /> a . Title of project <br /> b . Name of Contractor <br /> C . Binders : Commercial quality , three-ring , with durable and cleanable <br /> plastic cover. <br /> 1 . 05 TIME OF SUBMITTALS <br /> �� A . Make submittals within ten days after Date of Substantial Completion , <br /> prior to final request for payment . <br /> B . For items of work , where acceptance is delayed materially beyond the <br /> Date of Substantial Completion , provide updated submittal within ten days <br /> after acceptance , listing the date of acceptance as the start of the <br /> warranty period . <br /> 01740 - 2 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01740 Warranties and Bonds .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.