My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Each panel shall consist of two or more mill widths of open selvage construction ; the <br /> two upper layers shall be joined together by sewing , and the two bottom layers shall be <br /> sewn together at the edges . Where adjacent panels cannot be joined in this manner, <br /> they shall be lapped a minimum of 24t. In no case will simple butt joint , either sewn or <br /> unsewn , be permitted . The ends and upper limits of the fabric mat shall be placed in a <br /> trench not less than 24-in deep and backfilled for the entire perimeter of fabric riprap as <br /> shown on the plans . All backfill shall be compacted to a minimum of 95 percent <br /> modified proctor density. <br /> C . Small cuts shall be made in the fabric to allow for the insertion of the grout hose or grout <br /> nozzle . Grout shall be introduced into the space between the layers of fabric and shall <br /> be injected in such a way the excessive pressure on the fabric envelope is avoided . <br /> Starting at the lowest elevation and working up the slope , the grout shall be injected in <br /> such a way that the distance from the point of injection to the end of the panel is not <br /> greater than 30-ft. After grouting has been completed , the void between trench wall and <br /> filled fabric shall be backfilled and compacted . <br /> D . Holes in the fabric left by the removal of the grout hose or inserts shall be temporarily <br /> P Y <br /> closed by inserting a piece of burlap or similar material . The burlap shall be removed <br /> when the mortar is no longer fluid and the surface is firm to hand pressure . Foot traffic <br /> on the filled fabric formed concrete riprap shall be limited to an absolute minimum for 1 <br /> hour after pumping in order to reduce indentation . <br /> tE . Edge treatment for fabric formed riprap shall consist of a "key-in " or perpendicular <br /> placement of riprap , a minimum of 2-ft deep as measured from finished grade . Trench <br /> shall be backfilled and compacted no earlier than 1 hour after placement of concrete . <br /> Filled trench area shall be sodded as specified in Section 02485 . <br /> 3 . 03 ACCEPTANCE SAMPLING AND TESTING <br /> A . Acceptance test shall be by compressive strength , For each 500 s d or less of <br /> g qY <br /> placement, two concrete cylinders shall be made and tested at 28 days according to <br /> applicable procedures . <br /> END OF SECTION <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\02271 Fabric Formed Rip Rap.doc <br /> 02271 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.