Laserfiche WebLink
B . Each panel shall consist of two or more mill widths of open selvage construction ; the <br /> two upper layers shall be joined together by sewing , and the two bottom layers shall be <br /> sewn together at the edges . Where adjacent panels cannot be joined in this manner, <br /> they shall be lapped a minimum of 24t. In no case will simple butt joint , either sewn or <br /> unsewn , be permitted . The ends and upper limits of the fabric mat shall be placed in a <br /> trench not less than 24-in deep and backfilled for the entire perimeter of fabric riprap as <br /> shown on the plans . All backfill shall be compacted to a minimum of 95 percent <br /> modified proctor density. <br /> C . Small cuts shall be made in the fabric to allow for the insertion of the grout hose or grout <br /> nozzle . Grout shall be introduced into the space between the layers of fabric and shall <br /> be injected in such a way the excessive pressure on the fabric envelope is avoided . <br /> Starting at the lowest elevation and working up the slope , the grout shall be injected in <br /> such a way that the distance from the point of injection to the end of the panel is not <br /> greater than 30-ft. After grouting has been completed , the void between trench wall and <br /> filled fabric shall be backfilled and compacted . <br /> D . Holes in the fabric left by the removal of the grout hose or inserts shall be temporarily <br /> P Y <br /> closed by inserting a piece of burlap or similar material . The burlap shall be removed <br /> when the mortar is no longer fluid and the surface is firm to hand pressure . Foot traffic <br /> on the filled fabric formed concrete riprap shall be limited to an absolute minimum for 1 <br /> hour after pumping in order to reduce indentation . <br /> tE . Edge treatment for fabric formed riprap shall consist of a "key-in " or perpendicular <br /> placement of riprap , a minimum of 2-ft deep as measured from finished grade . Trench <br /> shall be backfilled and compacted no earlier than 1 hour after placement of concrete . <br /> Filled trench area shall be sodded as specified in Section 02485 . <br /> 3 . 03 ACCEPTANCE SAMPLING AND TESTING <br /> A . Acceptance test shall be by compressive strength , For each 500 s d or less of <br /> g qY <br /> placement, two concrete cylinders shall be made and tested at 28 days according to <br /> applicable procedures . <br /> END OF SECTION <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\02271 Fabric Formed Rip Rap.doc <br /> 02271 -3 <br />