My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 -- EXECUTION <br /> ' 3 . 01 GENERAL CONSTRUCTION METHODS <br /> ' Seeding and mulching operations will not be permitted when wind velocities <br /> exceed 15 miles per hour. Seed shall be sown only when the soil is moist and in <br /> proper condition to induce growth . No seeding shall be done when the ground is <br /> ' frozen , unduly wet, or otherwise not in a tillable condition . Whenever a suitable <br /> length of right-of--way or adjacent area has been graded , it shall be made ready, <br /> when directed by the Engineer, and grassed in accordance with these <br /> specifications . Grassing shall be incorporated into the project at the earliest <br /> ' practical time in the lift of the contract. <br /> 3 .02 SODDING <br /> A . Preparation of Area to be Sodded : The ground which is to receive sod <br /> shall have been graded to proper elevations (2" below sodded grade ) to <br /> match pre-construction conditions or proposed grades . All disturbed <br /> swales and ditches shall have been restored to their pre-construction <br /> condition or better. The pre-construction grade shall be maintained and <br /> ' the prepared soil shall be loose and reasonable smooth . It shall be <br /> reasonable free of large clods , roots , patches of existing grass , and other <br /> material which will interfere with the sod-laying operations or subsequent <br /> ' mowing and maintenance operations . <br /> B . Laying of Sod : Sod shall be installed in all areas so designated by <br /> Engineer. Sod shall be carefully placed so that each piece abuts flush to <br /> all surrounding sod , regardless of whether surrounding sod is new or <br /> existing . Where new sod is to be placed adjacent to existing sod , the new <br /> sod must be cut in to match the elevation of the existing sod . Uneven sod <br /> ' which might cause mowing problems will be rejected . New sod laid on <br /> top of existing sod will also be rejected . All sod placed on steep slopes <br /> (greater than 1 : 1 ) shall be pinned with a wooden pin to keep it in place . <br /> ' C . Rolling : Immediately after completion of the sod laying , the entire sodded <br /> area shall be rolled thoroughly with the equipment specified . At least two <br /> ' trips over the entire area will be required . <br /> D . Watering : Newly-sodded areas are to be watered by Contractor as <br /> necessary to keep sod alive until the Contractor is closed out . Dead sod <br /> shall be replaced by Contractor prior to contract closeout . <br /> 3 . 03 SEEDING <br /> A. Sequence of Operations : The operations involved in the work shall <br /> proceed in the following sequence : preparation of the ground , seeding , <br /> ' spreading , and cutting in mulch . <br /> ' 02485 - 3 <br /> FAUtilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\02485 Grassing .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.