My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Pipe Class 50 Class 52 <br /> Diameter Minimum Wall Thickness Minimum Wall Thickness <br /> ' ( Inches) (Inches) (Inches) <br /> 4 0 . 29 <br /> 6 0 . 25 0 . 31 <br /> ' 8 0 . 27 0 . 33 <br /> 10 0 . 29 0 . 35 <br /> 12 0 . 31 0. 37 <br /> ' 14 0 . 33 0. 39 <br /> 16 0 . 34 0 . 40 <br /> 18 0 . 35 0 . 41 <br /> ' 20 0 . 36 0 . 42 <br /> 24 0 . 38 0 . 44 <br /> 30 0 . 39 0 . 47 <br /> 36 0 .43 0 . 53 <br /> 42 0 . 47 0 . 59 <br /> ' 1 . 04 FITTINGS <br /> A. All underground fittings shall be either bell and spigot , or <br /> mechanical joint. Mechanical joints shall conform to AWWA <br /> Specification C110 (ANSI 21 . 10-87 ) , or latest revision . All <br /> aboveground fittings shall be flanged joint. <br /> ' B . The pressure rating shall be 250 psi for fittings up to 12 inches <br /> and a minimum of 150 psi for larger sizes . <br /> ' C . All fittings shall be lined with the same material as specified for the <br /> pipe as per paragraph 1 . 05 . <br /> ' 1 . 05 LINING AND COATING <br /> A. Unless otherwise indicated , all ductile iron pipe shall be factory <br /> ' lined and coated . <br /> B . Lining : All pipe shall be cement mortar lined and seal coated in <br /> ' accordance with AWWA Standard C104 (ANSI A21 . 4-85 ) , or <br /> latest revision . <br /> ' C . Coating : Unless specified otherwise , all pipe shall be bituminous <br /> coated outside to a dry film thickness of at least 2 mil . <br /> D . Repair: Anywhere that the coating is removed purposely or <br /> accidentally , the area shall be cleaned of any rust, grease , and dirt <br /> and re-coated to a minimum dry film as specified for the individual <br /> piece . <br /> E . Encasement : If and where directed by IRCDUS , a polyethylene <br /> encasement shall be provided over pipe , fittings , and valves . The <br /> ' 02625 - 2 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North <br /> County RO\BID DOCUMENTS\02625 WM Ductile Iron Pipe and Fittings . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.