My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paragraph 14 . 13 . <br /> ARTICLE 6 . INTEREST. <br /> Not Applicable , <br /> ARTICLE 7 . CONTRACTOR'S REPRESENTATIONS . <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations : <br /> 7. 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents , work, site , locality, and all local conditions and laws and regulations <br /> that in any manner may affect cost, progress , performance or furnishing of the <br /> work . <br /> 7 . 2 CONTRACTOR has studied carefully all reports of explorations and tests of <br /> subsurface conditions and drawings of physical conditions which are identified in <br /> the Supplementary Conditions as provided in Paragraph 4 . 2 of the General <br /> Conditions , and accepts the determination set forth in Paragraph SC-4 . 2 of the <br /> Supplementary Conditions of the extent of the technical data contained in such <br /> reports and drawings upon which CONTRACTOR is entitled to rely. <br /> 7 . 3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying ) all such examinations , investigations , <br /> explorations , tests , reports and studies (in addition to or to supplement those <br /> referred to in Paragraph 7 . 2 above ) which pertain to the subsurface or physical <br /> conditions at or contiguous to the site or otherwise may affect the cost, progress , <br /> performance or furnishing of the work as CONTRACTOR considers necessary for <br /> the performance of furnishing of the work at the Contract Price , within the Contract <br /> Time and in accordance with the other terms and conditions of the Contract <br /> Documents , including specifically the provisions of Paragraph 4 . 2 of the General <br /> Conditions ; and no additional examinations , investigations , explorations , tests , <br /> reports , studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes . <br /> 7 .4 CONTRACTOR has reviewed and checked all information and data shown or <br /> indicated on the Contract Documents with respect to existing underground facilities <br /> ' at or contiguous to the site and assumes responsibility for the accurate location of <br /> said underground facilities . No additional examinations , investigations , <br /> explorations , tests , reports , studies or similar information or data in respect of said <br /> underground facilities are or will be required by CONTRACTOR in order to perform <br /> and furnish the work at the Contract Price , within the Contract Time and in <br /> accordance with the other terms and conditions of the Contract Documents , <br /> 00530-4 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between Owner and Contractor.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.