in connection with the Work is subject to payment of any Subcontractor, Supplier, or other individual or entity <br /> to <br /> any license fee or royalty. All variations of the pro- furnish or perform any of the Work against whom <br /> posed substitute item from that specified will be CONTRACTOR has reasonable objection. <br /> identified in the application, and available <br /> engineering , sales , maintenance, repair, and B . If the Supplementary Conditions require the identity of <br /> replacement services will be indicated. The certain Subcontractors, Suppliers , or other individuals or entities <br /> application will also contain an itemized estimate of to be submitted to OWNER in advance for acceptance by <br /> ' all costs or credits that will result directly or indirectly OWNER by a specified date prior to the Effective Date <br /> of the <br /> from use of such substitute item, including costs of Agreement, and if CONTRACTOR has submitted a list thereof <br /> redesign and claims of other contractors affected by in accordance with the Supplementary Conditions , OWNER's <br /> any resulting change, all of which will be considered acceptance (either in writing or by failing to make written objec- <br /> by ENGINEER in evaluating the proposed substitute tion thereto by the date indicated for acceptance or objection in <br /> item. ENGINEER may require CONTRACTOR to the Bidding Documents or the Contract Documents ) of any such <br /> furnish additional data about the proposed Subcontractor, Supplier, or other individual or entity so identified <br /> substitute item. may be revoked on the basis of reasonable objection after due <br /> investigation. CONTRACTOR shall submit an acceptable <br /> B . Substitute Construction Methods or Procedures: If a replacement for the rejected Subcontractor, Supplier, or other <br /> specific means, method, technique, sequence, or procedure of individual or entity, and the Contract Price will be adjusted <br /> by <br /> construction is shown or indicated in and expressly required by the difference in the cost occasioned by such replacement, and <br /> the Contract Documents, CONTRACTOR may furnish or utilize an appropriate Change Order will be issued or Written <br /> a substitute means, method, technique, sequence, or procedure Amendment signed . No acceptance by OWNER of any such <br /> of construction approved by ENGINEER. CONTRACTOR shall Subcontractor, Supplier, or other individual or entity, whether <br /> submit sufficient information to allow ENGINEER, in initially or as a replacement, shall constitute a waiver of any <br /> ENGINEER's sole discretion, to determine that the substitute right of OWNER or ENGINEER to reject defective Work. <br /> ' proposed is equivalent to that expressly called for by the <br /> Contract Documents. The procedure for review by ENGINEER C. CONTRACTOR shall be fully responsible to OWNER <br /> will be similar to that provided in subparagraph 6.05.A.2. and ENGINEER for all acts and omissions of the <br /> Subcontractors, Suppliers, and other individuals or entities <br /> C. Engineer's Evaluation: ENGINEER will be allowed a performing or furnishing any of the Work just as <br /> reasonable time within which to evaluate each proposal or CONTRACTOR is responsible for CONTRACTOR's own acts <br /> submittal made pursuant to paragraphs 6.05.A and 6.05. 13 . and omissions . Nothing in the Contract Documents shall <br /> create <br /> ENGINEER will be the sole judge of acceptability. No "or-equal" for the benefit of any such Subcontractor, Supplier, or <br /> other <br /> or substitute will be ordered , installed or utilized until individual or entity any contractual relationship between <br /> ENGINEER's review is complete, which will be evidenced by OWNER or ENGINEER and any such Subcontractor, Supplier <br /> either a Change Order for a substitute or an approved Shop or other individual or entity, nor shall it create <br />any obligation on <br /> Drawing for an "or equal ." ENGINEER will advise the part of OWNER or ENGINEER to pay or to see to the <br /> ' CONTRACTOR in writing of any negative determination. payment of any moneys due any such Subcontractor, Supplier, <br /> or other individual or entity except as may otherwise be required <br /> D. Special Guarantee: OWNER may require CON- by Laws and Regulations . <br /> TRACTOR to fumish at CONTRACTOR's expense a special <br /> performance guarantee or other surety with respect to any D . CONTRACTOR shall be solely responsible for <br /> substitute. scheduling and coordinating the Work of Subcontractors , <br /> Suppliers , and other individuals or entities performing or furnish- <br /> E. ENGINEER's Cost Reimbursement ENGINEER will ing any of the Work under a direct or indirect contract with <br /> ' record time required by ENGINEER and ENGINEER's Consul- CONTRACTOR. <br /> tants in evaluating substitute proposed or submitted by <br /> CONTRACTOR pursuant to paragraphs 6. 05.A.2 and 6.05. 13 E. CONTRACTOR shall require all Subcontractors , <br /> and in making changes in the Contract Documents (or in the Suppliers , and such other individuals or entities <br /> performing or <br /> provisions of any other direct contract with OWNER for work on furnishing any of the Work to communicate with ENGINEER <br /> the Project) occasioned thereby. Whether or not ENGINEER through CONTRACTOR. <br /> approves a substitute item so proposed or submitted by CON- <br /> TRACTOR, CONTRACTOR shall reimburse OWNER for the F. The divisions and sections of the Specifications and <br /> ' charges of ENGINEER and ENGINEER's Consultants for the identifications of any Drawings shall not control <br /> evaluating each such proposed substitute. CONTRACTOR in dividing the Work among Subcontractors or <br /> Suppliers or delineating the Work to be performed by any <br /> F. CONTRACTOR's Expense: CONTRACTOR shall specific trade. <br /> provide all data in support of any proposed substitute or <br /> ' "or-equal" at CONTRACTOR's expense. G . All Work performed for CONTRACTOR by a <br /> Subcontractor or Supplier will be pursuant to an appropriate <br /> 6. 06 Concerning Subcontractors, Suppliers, and Others agreement between CONTRACTOR and the Subcontractor or <br /> Supplier which specifically binds the Subcontractor or Supplier <br /> A. CONTRACTOR shall not employ any Subcontractor, to the applicable terms and conditions of the Contract <br /> Supplier, or other individual or entity (including those acceptable Documents for the benefit of OWNER and ENGINEER. <br /> to OWNER as indicated in paragraph 6.06. 13 ), whether initially Whenever any such agreement is with a Subcontractor <br /> or <br /> or as a replacement, against whom OWNER may have reason- Supplier who is listed as an additional insured on the property <br /> able objection . CONTRACTOR shall not be required to employ insurance provided in paragraph 5. 06, the agreement between <br /> r00700 - 17 <br />