My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' C. If the proper execution or results of any part of available to CONTRACTOR copies of reports <br /> of explorations <br /> CONTRACTOR's Work depends upon work performed by and tests of subsurface conditions and drawings of <br /> physical <br /> others under this Article 7, CONTRACTOR shall inspect such conditions in or relating to existing surface <br /> or subsurface <br /> ' other work and promptly report to ENGINEER in writing any structures at or contiguous to the Site that have been <br /> utilized by <br /> delays , defects , or deficiencies in such other work that render it ENGINEER in preparing the Contract Documents. <br /> unavailable or unsuitable for the proper execution and results of <br /> CONTRACTOR's Work. CONTRACTOR's failure to so report 8 . 06 Insurance <br /> will constitute an acceptance of such other work as fit and <br /> proper for integration with CONTRACTOR's Work except for A. OWNER's responsibilities , if any, in respect to pur- <br /> latent defects and deficiencies in such other work. chasing and maintaining liability and property insurance are set <br /> forth in Article 5. <br /> 7.02 Coordination <br /> A. If OWNER intends to contract with others for the 8 .07 Change Orders <br /> performance of other work on the Project at the Site, the A. OWNER is obligated to execute Change Orders <br /> as <br /> following will be set forth in Supplementary Conditions : indicated in paragraph 10. 03. <br /> 1 .the individual or entity who will have authority and 8. 08 Inspections, Tests, and Approvals <br /> responsibility for coordination of the activities among the <br /> ' various contractors will be identified; A. OWNER's responsibility in respect to certain inspec- <br /> 2. the specific matters to be covered by such tions , tests, and approvals is set forth in paragraph 13. <br />03. 8. <br /> authority and responsibility will be itemized; and 8 .09 Limitations on OWNER's Responsibilities <br /> 3. the extent of such authority and responsibilities A. The OWNER shall not supervise, direct, or have <br /> will be provided. control or authority over, nor be responsible for, <br /> CONTRACTOR's means, methods , techniques , sequences, or <br /> B. Unless otherwise provided in the Supplementary procedures of construction, or the safety precautions <br /> and <br /> ' Conditions , OWNER shall have sole authority and responsibility programs incident thereto, or for any failure of CONTRACTOR <br /> for such coordination. to comply with Laws and Regulations applicable to the perfor- <br /> mance of the Work. OWNER will not be responsible for <br /> CONTRACTOR's failure to perform the Work in accordance <br /> ' ARTICLE 8 - OWNER'S RESPONSIBILITIES with the Contract Documents , <br /> 8 . 10 Undisclosed Hazardous Environmental Condition <br /> 8.01 Communications to Contractor <br /> A. OWNER's responsibility in respect to an undisclosed <br /> A. Except as otherwise provided in these General Condi- Hazardous Environmental Condition is set forth in paragraph <br /> tions, OWNER shall issue all communications to 4.06. <br /> CONTRACTOR through ENGINEER. <br /> 8. 02 Replacement of ENGINEER 8 . 11 Evidence of Financial Arrangements <br /> A. If and to the extent OWNER has agreed to furnish <br /> A. In case of termination of the employment of ENGI- CONTRACTOR reasonable evidence that financial <br /> NEER, OWNER shall appoint an engineer to whom arrangements have been made to satisfy OWNER's obligations <br /> CONTRACTOR makes no reasonable objection, whose status under the Contract Documents , OWNER's responsibility in <br /> under the Contract Documents shall be that of the former ENGI- respect thereof will be as set forth in the <br /> Supplementary <br /> NEER. Conditions . <br /> 8. 03 Furnish Data <br /> ARTICLE 9 - ENGINEER'S STATUS DURING <br /> A. OWNER shall promptly furnish the data required of CONSTRUCTION <br /> OWNER under the Contract Documents . <br /> 8 . 04 Pay Promptly When Due 9. 01 OWNER'S Representative <br /> A. OWNER shall make payments to CONTRACTOR A. ENGINEER will be OWNER's representative during <br /> promptly when they are due as provided in paragraphs 14.02.0 the construction period . The duties and responsibilities and <br /> the <br /> and 14.07. C. limitations of authority of ENGINEER as OWNER's <br /> representative during construction are set forth in the Contract <br /> 8 .05 Lands and Easements; Reports and Tests Documents and will not be changed without written consent of <br /> OWNER and ENGINEER. <br /> A. OWNER's duties in respect of providing lands and <br /> easements and providing engineering surveys to establish 9. 02 visits to Site <br /> reference points are set forth in paragraphs 4.01 and 4. 05. <br /> Paragraph 4 . 02 refers to OWNER's identifying and making <br /> ' 00700 - 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.