Laserfiche WebLink
2 . In case of discrepancy, the governing order of the contract documents shall be as <br /> 1 follows : <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> 3 , Specifications <br /> 4 , Supplementary Conditions <br /> 5 , General Conditions <br /> 6 , Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards , <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC -4 .02 Subsurface and Physical Conditions <br /> SC4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> C . In preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> 1 . Report dated N/A , prepared by , entitled : <br /> , consisting of pages . <br /> The "technical data" contained in such report on which CONTRACTOR may <br /> rely is <br /> D . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants relied upon the following drawings of physical conditions in or relating <br /> to existing surface and subsurface structures (except Underground Facilities ) which <br /> are at or contiguous to the Site: <br /> 1 . Drawings dated February. 2004 , prepared by IRCDUS . entitled : North <br /> County R/O Project — Phase II consisting of 4 sheets numbered 1 of 2 , 2 of <br /> 2 , and Figure 1 and Figure 2 . All of the information in such drawings <br /> constitutes "technical data" on which CONTRACTOR may rely. <br /> E . Copies of reports and drawings itemized in SC-4 . 02 . 0 and SC-4 . 02 . D that are not <br /> included with Bidding Documents may be examined at <br /> N/A during <br /> regular business hours . These reports and drawings are not part of the Contract <br /> Documents , but the "technical data" contained therein upon which CONTRACTOR <br /> may rely as identified and established above are incorporated therein by reference . <br /> CONTRACTOR is not entitled to rely upon other information and data utilized by <br /> ENGINEER and ENGINEER's Consultants in the preparation of Drawings and <br /> Specifications . <br /> SC -4 . 05 Reference Points <br /> SC-4 . 05 Add the following new paragraphs immediately after GC-4. 05.A : <br /> B . Contractor is responsible for measuring and recording existing swale <br /> elevations at 100 ' intervals prior to construction . Existing swale elevations <br /> shall be maintained throughout construction , Contractor is also responsible <br /> for preservation and/or replacement of any and all existing permanent survey <br /> monumentation affected by construction . <br /> 00800 - Supplementary Conditions .doc <br /> 00800 - 2 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County RO\BID DOCUMENTS\00800 - <br /> Supplementary Condilions .doc Rev. 05/01 <br />