Laserfiche WebLink
3 . Perform any duties of the Contractor <br /> 1 .06 CONTRACTOR' S RESPONSIBILITIES <br /> A. Cooperate with laboratory personnel , and provide access to work <br /> and to manufacturer' s facilities . <br /> B . Secure and deliver to the laboratory adequate quantities of <br /> representational samples of proposed materials , which require <br /> testing . <br /> C . Provide to the laboratory the proposed preliminary design mix for <br /> concrete , and other material mixes that require control by the <br /> testing laboratory . <br /> D . Furnish copies of product test reports as required . <br /> E . Furnish incidental labor and facilities : <br /> 1 . To provide access to work to be tested <br /> 2 . To obtain and handle samples at the project site or at the <br /> source of the product to be tested <br /> 3 . To facilitate inspections and tests <br /> 4 . For storage and curing of test samples <br /> F . Notify laboratory , in advance of operations to allow for laboratory <br /> assignments of personnel and scheduling of tests . <br /> PART 2 -- PRODUCTS <br /> Not applicable <br /> PART 3 -- EXECUTION <br /> Not applicable <br /> END OF SECTION <br /> 01410 - 3 <br /> R\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01410 <br /> Testing Laboratory Services .doc <br />