My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . When project is alteration and additional work, DO NOT use <br /> materials and equipment removed from existing structure , except <br /> as specifically allowed by notation or indication by Contract <br /> Documents . <br /> 1 . 04 WORKMANSHIP <br /> A . Comply with industry standards except when more restrictive <br /> tolerances or specified requirements indicate more rigid standards <br /> or more precise workmanship . <br /> B . Perform work by persons qualified to produce workmanship of <br /> specified quality. <br /> C . Secure products in place with positive anchorage devises <br /> designed and sized to withstand stresses , vibration , and rocking . <br /> 1 .05 MANUFACTURER' S INSTRUCTIONS <br /> A. When work is specified to comply with manufacturer's printed <br /> instructions , obtain and distribute copies to persons involved , and <br /> maintain one set at job site in field office . <br /> B . Perform work in accordance with manufacturer's instructions and <br /> specified requirements . <br /> C . Should a conflict exist between Specifications and manufacturer' s <br /> instructions , consult with Engineer. <br /> 1 .06 TRANSPORTATION AND HANDLING <br /> A. Arrange deliveries of products in accordance with construction <br /> schedules ; coordinate to avoid delay of progress , conflict with <br /> work and with conditions at the site . <br /> B . Transport products by methods to avoid product damage ; deliver <br /> in undamaged condition in manufacturer's unopened containers or <br /> packaging , dry. <br /> C . Provide equipment and personnel to handle product by methods <br /> to prevent soiling or damage . <br /> D . Promptly inspect shipments to assure that products comply with <br /> requirements , quantities are correct and products are undamaged . <br /> 01600 - 2 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01600 <br /> Material and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.