My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• D . When Engineer concurs that the work is substantially complete , he will : <br /> 1 . Prepare a Certificate of Substantial Completion , accompanied by <br /> a list of items to be completed or corrected <br /> 2 . Submit the Certificate to Owner and Contractor for their written <br /> acceptance of the responsibilities assigned to them in the <br /> certificate . <br /> 1 . 03 FINAL INSPECTION <br /> A . When Contractor considers the work is complete , he shall submit written <br /> certification that : <br /> 1 . Contract Documents have been reviewed <br /> 2 . Work has been inspected for compliance with Contract <br /> Documents <br /> 3 . Work has been completed in accordance with Contract <br /> Documents <br /> 4 . Equipment and systems have been tested in the presence of the <br /> Owner's representative and are operational <br /> 5 . Equipment and systems instructions to Owner' s personnel have <br /> been completed in accordance with Section 01730 <br /> 6 . Work is completed and ready for final inspection <br /> . B . Engineer will make an inspection to verify the status of completion with <br /> reasonable promptness after receipt of such certification . <br /> C . Should Engineer consider that the work is incomplete or defective : <br /> 1 . Engineer will promptly notify the Contractor, in writing , listing the <br /> incomplete or defective work . <br /> 2 . Contractor shall take immediate steps to remedy the stated <br /> deficiencies , and send a second written certification to Engineer <br /> that the work is complete . <br /> 3 . Engineer will re-inspect the work <br /> D . When Engineer finds that the work is acceptable under the Contract <br /> Documents , he shall request the Contractor to make closeout submittals . <br /> 1 . 04 RE-INSPECTION FEES <br /> Should the Engineer perform re-inspection due to failure of the work to comply <br /> with the claims of status of completion made by the Contractor, Contractor will <br /> compensate Engineer/Owner for such additional services . <br /> 01700 - 2 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01700 <br /> Contract Close-out.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.