Laserfiche WebLink
. SECTION 01710 <br /> CLEANING <br /> PART 1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> Execute cleaning , during progress of the work, and at completion of the work , as <br /> required by General conditions . <br /> 1 .02 DISPOSAL REQUIREMENTS <br /> Conduct cleaning and disposal operations to comply with codes , ordinances , <br /> regulations , and anti-pollution laws . <br /> PART 2 -- PRODUCTS <br /> 2 . 01 MATERIALS <br /> A . Use only those cleaning materials which will not create hazards to health <br /> or property and which will not damage finishes and surfaces . <br /> B . Use only those cleaning materials and methods recommended by <br /> . manufacturer of the surface material to be cleaned . <br /> C . Use cleaning materials only on surfaces recommended for cleaning by <br /> the material manufacturer. <br /> PART 3 -- EXECUTION <br /> 3 .01 DURING CONSTRUCTION <br /> A. Execute daily cleaning to keep the work, the site , and adjacent properties <br /> free from accumulation of waste materials , rubbish , and windblown debris <br /> resulting from construction operations . <br /> B . Dispose of waste materials , cartons , crating , debris , and rubbish at <br /> designated waste receptacles . <br /> C . Contractor shall maintain a broom-cleaned site during the entire <br /> construction phase . <br /> D . For exterior utility work (such as underground pipelines , roadways , <br /> service areas , etc. ) , these shall be cleaned daily. Not less frequently than <br /> once weekly. Roadways shall be mechanically broom-cleaned . <br /> 01710 - 1 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01710 <br /> Cleaning .doc <br />