Laserfiche WebLink
2 . In case of discrepancy, the governing order of the contract documents shall be as <br /> • follows : <br /> a . Written Interpretations <br /> b . Addenda <br /> c . Specifications <br /> d . Supplementary Conditions <br /> e . General Conditions <br /> f. Approved Shop Drawings <br /> g . Drawings <br /> h . Referenced Standards . <br /> 3 . Written/computed dimensions shall govern over scaled dimensions . <br /> SC4 . 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. B: <br /> C . In preparation of Drawings and Specifications , ENGINEER or ENGINEER 's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> 1 . Report dated N/A , prepared by , entitled : <br /> , consisting of pages . <br /> The "technical data " contained in such report on which CONTRACTOR may <br /> rely is <br /> . D . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER'S <br /> Consultants relied upon the following drawings of physical conditions in or relating <br /> to existing surface and subsurface structures (except Underground Facilities) which <br /> are at or contiguous to the Site : <br /> 1 . Drawings dated June 6 , 2000 , prepared by Carter Associates . Inc. , <br /> entitled : Sebastian Wat. Exp . Phs , 3D Survey., consisting of 12 sheets <br /> numbered 1 to 12 , inclusive . All of the information in such drawings <br /> constitutes "technical data" on which CONTRACTOR may rely. <br /> E . Copies of reports and drawings itemized in SC-4 . 02 . 0 and SC4 . 02 . D that are not <br /> included with Bidding Documents may be examined at <br /> Indian River County Utilities Department during regular business hours . These <br /> reports and drawings are not part of the Contract Documents , but the "technical <br /> data" contained therein upon which CONTRACTOR may rely as identified and <br /> established above are incorporated therein by reference . CONTRACTOR is not <br /> entitled to rely upon other information and data utilized by ENGINEER and <br /> ENGINEER's Consultants in the preparation of Drawings and Specifications . <br /> SC4. 05 Reference Points <br /> SC-4 . 05 Add the following new paragraphs immediately after GC-4. 05. A : <br /> B . Contractor is responsible for measuring and recording existing swale <br /> elevations at 100 ' intervals prior to construction . Existing swale elevations <br /> . shall be maintained throughout construction . Contractor is also responsible <br /> for preservation and/or replacement of any and all existing permanent survey <br /> monumentation affected by construction . <br /> 00800 - Supplementary Conditions <br /> 00800 - 2 <br /> FAUtilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\00800 - Supplementary Conditions.doc Rev. <br /> 05/01 <br />