My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6706 - 050 <br /> 4 . Shop Drawings and Samples : <br /> a . Receive and record date of receipt of Shop Drawings and samples , <br /> receive samples which are furnished at the site by CONTRACTOR , and <br /> notify ENGINEER of their availability for examination . <br /> b . Advise ENGINEER and CONTRACTOR or his superintendent immediately <br /> of the commencement of any Work requiring a Shop Drawing or sample <br /> submission if the submission has not been approved by the ENGINEER . <br /> 5 . Review of Work , Rejection of Defective Work , Inspections and Tests : <br /> a . Conduct on - site observations of the Work in progress to assist ENGINEER <br /> in determining if the Work is proceeding in accordance with the Contract <br /> Documents and that completed Work will conform to the Contract <br /> Documents . <br /> b . Report to ENGINEER whenever he believes that any Work is <br /> unsatisfactory , faulty or defective or does not conform to the Contract <br /> Documents , or does not meet the requirements of any inspections , tests <br /> or approval required to be made or has been damaged prior to final <br /> payment ; and advise ENGINEER when he believes Work should be <br /> corrected or rejected or should be uncovered for observation , or requires <br /> special testing , inspection or approval . i <br /> c . Verify that tests , equipment and systems startups and operating and <br /> maintenance instructions are conducted as required by the Contract <br /> Documents and in presence of the required personnel , and that <br /> CONTRACTOR maintains adequate records thereof; observe , record and <br /> report to ENGINEER appropriate details relative to the test procedures and <br /> startups . <br /> d . Accompany visiting inspectors represeenting public or other agencies <br /> having jurisdiction over the Project , record the outcome of these <br /> inspections and report to ENGINEER . <br /> 6 : Interpretation of Contract Documents : Transmit to CONTRACTOR <br /> engineer ' s clarifications and interpretations of the Contract Documents , <br /> 7 . Modifications : Consider and evaluate CONTRACTOR ' S suggestions for <br /> modifications in Drawings or Specifications and report them with <br /> recommendations to ENGINEER . <br /> 00800 - z.7 s <br /> 2121195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.