My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01060 <br /> REGULATORY REQUIREMENTS AND NOTIFICATION <br /> PART 1 -- GENERAL <br /> 1 . 01 PERMITS REQUIRED <br /> A. Florida Department of Environmental Protection : The general permit from <br /> the Florida Department of Environmental Protection ( FDEP ) for the project <br /> is being obtained . <br /> B . INDIAN RIVER COUNTY: The Contractor, along with the IRCDUS , must <br /> obtain right-of-way permit(s ) from Indian River County prior to initiating <br /> construction . It typically requires one-week processing time to receive a <br /> right-of-way permit. There is no processing fee for the permit. One set of <br /> construction plans must be submitted along with a permit application to the <br /> Indian River County Engineering Department. Some of the conditions of <br /> the County right-of-way permits are as follows : <br /> 1 . Applicant shall not begin construction of any kind in the County <br /> right-of-way prior to application and issuance of a valid permit by <br /> Indian River County. <br /> 2 . Any area disturbed in the County right-of-way must be restored by <br /> applicant to a condition equal to or better than existing just prior to <br /> construction , including but not limited to compaction , grading , <br /> paving , seeding and mulching , sodding , etc. , as the case may be . <br /> The quality of construction , materials , and workmanship shall be in <br /> accordance with County standards . All disturbed areas shall be <br /> restored within 48 hours after excavation . <br /> 3 . Applicant shall notify the County Engineering Division at least 48 <br /> hours prior to the placement of concrete , paving of asphalt, <br /> installation of culverts , or backfilling of trenches , so that the County <br /> may inspect installations as necessary. Applicant shall further notify <br /> the County Engineering Department in writing of its request for final <br /> inspection and approval at the completion of the permitted activity. <br /> 4 . The applicant shall assume responsibility for all maintenance , <br /> replacement , or removal of any right-of-way improvement <br /> authorized by this permit; and applicant further agrees by <br /> acceptance of this permit to indemnify and save harmless the <br /> County, its officers , employees , or agents , from any damages , <br /> claims , causes of action , or losses , whether for personal injury, loss <br /> of life or property damage , arising from the actions or omissions of <br /> applicant, its officers , agents , or employees , associated with the <br /> placement , maintenance or removal of installations authorized by <br /> 1060 - 1 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01060 <br /> Regulatory Requirements and Notification .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.