Laserfiche WebLink
ZCT <br /> toil'This document i 1. ' <br /> ,am* should be returned to <br /> the County Attorney's Office, AGREEMENT <br /> 1840 25th St., Vett Beach, 1595434 <br /> Florida 32960 BETWEEN THIS DOCUMENT HAS BEEN RECORDED <br /> IN THE PUBLIC RECORDS OF <br /> INDIAN RIVER COUNTY FL <br /> INDIAN RIVER COUNTY, FLORIDA 5K : 1806 PG : 2265 , Pagel of 11 <br /> 12/01 /2004 at 08 : 35 AM , <br /> AND JEFFREY K BARTON , CLERK OF <br /> COURT <br /> WILLIAM BALLOUGH, PROPERTY OWNER <br /> FOR THE CONSTRUCTION OF OFF-SITE WATER SYSTEM UTILITIES TO SERVE THE <br /> BALLOUGH PROPERTY AND THE SURROUNDING RESIDENTIAL COMMUNITY <br /> THIS AGREEMENT by and between INDIAN RIVER COUNTY, a political subdivision of the State of <br /> Florida, the address of which is 1840 25th Street, Vero Beach, Florida 32960 (hereinafter the "COUNTY") <br /> and William BallouEh , the address of which is 945 Sebastian Blvd #3 (hereinafter the DEVELOPER) is <br /> effective upon execution by the second of the two parties . <br /> WHEREAS , the DEVELOPER, is desirous to construct a water system to service his property by a <br /> connection to the existing County water distribution system and where it would benefit other area residents <br /> along Massey Road by having a water system available . And where it would benefit the community and the <br /> Developer to construct a water distribution system to service all parties ' needs . <br /> WHEREAS , the COUNTY ' S financial share is none . <br /> WHEREAS , pursuant to Section 918 . 05 , The Code of Indian River County (Ordinance 90- 16 , as <br /> amended), the COUNTY requires the DEVELOPER to provide the utility improvements to serve this road, and <br /> agrees to reimburse the DEVELOPER, as provided herein, for the cost of providing these off-site utilities, <br /> NOW, THEREFORE, for and in consideration of the mutual promises set forth herein and other good and <br /> valuable consideration , the COUNTY and DEVELOPER agree as follows : <br /> 1 . OFF-SITE UTILITIES : <br /> The DEVELOPER shall construct the necessary off-site utilities described herein as directed by the Indian <br /> River County Utilities Department. The COUNTY shall reimburse the DEVELOPER for installation of an <br /> offsite water system as outlined below: <br /> A . 8 -inch Diameter Water System along the East side of Massey Rpad from north side CR 510 <br /> terminating after 70 foot horizontal bore is complete . The total distance of 8 " PVC shall be approximately <br /> 1343 lineal feet. <br /> B . After horizontal bore is complete, a 6-inch PVC shall be used for the remainder of the water line <br /> extension . The total distance of 6-inch PVC shall be approximately 657 lineal feet. <br /> The DEVELOPER shall furnish and install a water system along the east side Massey Road from the <br /> north east corner of the intersection of CR 510 and Massey Road. The water system will consist of <br /> approximately 1343 lineal feet of 8 -inch PVC and PE watermain, and 657 lineal feet of 6 inch PVC , <br /> two (2) fire hydrant assemblies, and all other appurtenances . (See Exhibit "C ") <br /> Page 1 <br /> CIDOCUMENTS AND SETTINGS\CAROLE\MY DOCUMENTS\MGB CONSTRUCTION\DEVELOPERS AGREEMENT 7-28-04.DOC <br />