My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-236
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 10:49:15 AM
Creation date
9/30/2015 6:46:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/09/2003
Control Number
2003-236
Agenda Item Number
11..3
Entity Name
Masteller and Moler
Subject
Work Authorization #3 Consulting Services
Area
Center Regional Wastewater Treatment Plant 3550 49th St.
Archived Roll/Disk#
3162
Supplemental fields
SmeadsoftID
3391
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Authorization #3 <br /> 09/03 /03 <br /> Page 4 <br /> • Printing and Reproduction <br /> The County shall make direct payment to our office for the cost of printing project plan sheets <br /> required for utility coordination and for copies of reports, drawings, specifications, bidding and <br /> construction contract documents, and other pertinent items required by federal, state and local <br /> agencies from whom approval of the project must be obtained, prospective bidders, material <br /> suppliers, and other interested parties, but may charge only for the actual cost of providing such <br /> copies based on the following tabulation: <br /> 8 - 1 /2 " x 11 " $ 0 . 25/sheet blue line prints $ 0 . 333 /SF <br /> 11 " x 17" $ 0 . 50/sheet reproducible sepias $ 0. 75/SF <br /> 3Y2" diskette $ 5 . 00/ea. reproducible mylars $ 4 . 40/SF <br /> CD $ 10 . 00/ea. <br /> • Time of Performance <br /> The estimated time frame for completion of services from the approval of this Work <br /> Authorization is as follows : <br /> 1 . Engineering Design & Preparation of Construction <br /> Plans, Specifications and Bid Documents 5 Months <br /> 2 . Submittal of Permit Applications, Bidding, Contract 3 Months <br /> Award and Receipt of Permits <br /> 3 . Project Construction 15 Months <br /> File #0325(workauth#3_rev.090303 .doc) <br /> 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.