My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-201
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 1:45:13 PM
Creation date
10/1/2015 3:42:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/21/2009
Control Number
2009-201
Agenda Item Number
8.N.
Entity Name
Carter Associates Inc.
Subject
Amendment No. 10 services agreement 66th Ave. Improvements
Area
66th Ave. between SR 60 and 4th St.
Project Number
9810
Supplemental fields
SmeadsoftID
10732
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . N <br /> AMENDMENT NO . 10 TO THE PROFESSIONAL C <br /> ENGINEERING SERVICES AGREEMENT <br /> 6611 AVENUE PAVING AND DRAINAGE IMPROVEMENTS <br /> BETWEEN SR 60 AND 4TH STREET <br /> IRC PROJECT NO . 9810 <br /> THIS is an amendment to the existing AGREEMENT dated NOVEMBER 17 , 1998 , including <br /> AMENDMENTS NUMBER 1 through 9 , between CARTER ASSOCIATES , INC . (ENGINEER) and <br /> INDIAN RIVER COUNTY ( COUNTY ) . The proposed scope of work includes updating the existing survey <br /> data on 66t" Avenue and adjacent side streets , locating existing utility pipelines , designing additional <br /> stormwater management facilities , and permitting the Phase 2 improvements . All provisions of the original <br /> Professional Engineering Services Agreement including Amendment Nos . 1 through 9 shall remain in full <br /> force and effect, unless otherwise specifically modified . This amendment addresses changes in " SCOPE OF <br /> SERVICES " , " COMPENSATION " and "TIME OF COMPLETION " of the AGREEMENT . <br /> SCOPE OF SERVICES <br /> See attached letter from Carter Associates , Inc . dated October 10 , 2008 , which specifies changes in the <br /> " SCOPE OF SERVICES " and " COMPENSATION" and " TIME FOR COMPLETION . " <br /> COMPENSATION <br /> This section of the AGREEMENT entitled SECTION V - COMPENSATION shall be revised in <br /> response to the Scope modifications set out herein . The charges associated with this AMENDMENT NO . 9 <br /> are as follows : <br /> Fees for Engineering Services : Lump Sum Amount $ 73 , 980 . 00 <br /> Reimbursable Costs Not to Exceed Amount $ 600 . 00 <br /> TOTAL Amendment No . 10 $ 744580 . 00 <br /> The charges associated with the AGREEMENT (which include changes from Amendments 1 through 9 and <br /> these additional services included in proposed Amendment 9) , shall be increased from $ 482 , 685 . 00 to <br /> $ 557 ,265 . 00 . <br /> F : AEngincering\Capital Projects\9810-66th Ave, 4th St to SR 60\9810 Amendment 10 06- 18 -09 . doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.