My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-210
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 3:34:25 PM
Creation date
9/30/2015 6:43:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/19/2003
Control Number
2003-210
Agenda Item Number
11.C.1
Entity Name
Ace Electrical Services, Inc.
Subject
Shooting Range Lighting
Area
Shooting Range
Bid Number
5083
Archived Roll/Disk#
3162
Supplemental fields
SmeadsoftID
3360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 4. QUANTITIES AND PRICES <br />The Owner shall pay the CONTRACTOR for all work included and completed in accordance with <br />this Contract, based on the items of work set forth in the CONTRACTOR'S Bid Form, <br />Article 5. ACCEPTANCE AND FINAL PAYMENT <br />When the work provided for under this contract has been completed, in accordance with the terms <br />thereof, that a lump sum payment request in the amount of such work shall be prepared by the <br />CONTRACTOR, and filed with the OWNER within fifteen days after the date of completion. <br />The final estimate shall be accompanied by a Certificate of Acceptance issued by the ENGINEER, <br />stating that the work has been completed to his satisfaction, in compliance with the Contract. The <br />Certificate of Acceptance shall not be issued until completed Asbuilt drawings of the actual <br />construction have been furnished to the OWNER and verified. <br />In accordance with the Florida Prompt Payment Act, after receipt of the ENGINEER'S final <br />acceptance by the OWNER, the OWNER shall make payment to the CONTRACTOR in the full <br />amount. PAYMENT of the lump sum amount and acceptance of such payment by the <br />CONTRACTOR shall release the OWNER from all claims or liabilities to the CONTRACTOR in <br />connection with this Contract. <br />Article 6. THE CONTRACT DOCUMENTS <br />The General Conditions, Special Conditions, Specifications, Bid Documents, Insurance Requirements <br />(Exhibit A), Bonds, and the Drawings, together with this Agreement, form the Contract, and are fully <br />a part of this Contract as if included herein. <br />Article 7. VENUE <br />This agreement shall be governed by the laws of the State of Florida. Venue for any lawsuit brought <br />by either party against the other party or otherwise arising out of this agreement shall be in Indian <br />River county, Florida, or in the event of federal jurisdiction, in the United States District Court for the <br />Southern T)ictrirt of Fln,-;.1� <br />Witnessed by: <br />r r: fwilliam G. Collins, F1, County Attorney <br />�P Approved as to Form and Legal Sufficiency <br />E <br />County Administrator <br />Page 2 of 2 <br />INDIAY RIVER COUNTY, FLORIDA <br />R. Macht, Chairman <br />Approved by BCC: August 19, 2003 <br />Attest: <br />Jeffrey K Barton, Clerk of Circuit Court <br />Deputy Clerk <br />M <br />. <br />gig y <br />MAU <br />S's <br />LOU <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.