Laserfiche WebLink
• <br />t <br />• <br />approval to install the practices according to approved designs. The BMP installation must meet <br />all design criteria before it can be certified as complete by IRSWCD/NRCS staff. Routine <br />consultation with NRCS/IRSWCD staff throughout the installation process is advised. <br />Once installation is complete the grower shall provide the IRSWCD all of the appropriate <br />documentation. The IRSWCD will then submit all of the documentation to the Board for <br />authorization of reimbursement to the grower. <br />The IRSWCD will provide FDACS with quarterly reports. These reports will include: a <br />summary of all work accomplished, the number of acres enrolled in each practice, the amount of <br />program funds distnbuted to date, a summary of the amount of program funds used as non- <br />federal match, the amount of federal matching funds applied to this program through USDA <br />conservation programs, and all of the invoices supporting the distnbution of program funds. <br />PROGRAM FUNDING PRIORITIES: <br />Project funds for each year will be distributed to applicants based upon the Environmental <br />Benefits Index (EBI) ranking delineated below. <br />BMP <br />• <br />Environmental Benefit Index <br />1. On-site Water Detention/Retention <br />2. Conversion or Repair of Flashboard Riser Water Control Structure <br />3. Precision Application Equipment <br />4. Portable Agrichemical Mixing Station <br />5. Chemigation Infrastructure <br />6. Aquatic Weed Barrier <br />7. Permanent Agnchemical Washdown Station <br />8. Water Table Observation Well <br />9 Grade Stabilization Structure <br />10. Conversion to Microirrigation <br />DELIVERABLES: <br />• <br />POINTS <br />100 each <br />25 each <br />20 each <br />20 each <br />20 each <br />10 each <br />10 each <br />5 each <br />5 each <br />1 point per acre <br />1. Quarterly reports as described above will be provided to the FDACS Project Manager in <br />hard copy and electronic format. <br />2. A detailed Final Annual Report will be provided to the FDACS Project Manager in hard <br />copy and electronic format. This report will consist of a detailed summary of the <br />information included in the quarterly reports and an assessment of the overall success of <br />the program. <br />03/05/02 3 <br />