My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-037W.
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-037W.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2021 2:41:26 PM
Creation date
9/30/2015 6:19:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/11/2003
Control Number
2003-037W
Agenda Item Number
11.C.2.
Entity Name
Adair Citrus Acres-Robert C. & Diane W. Adair, Jr.
Subject
Water Table Observation Well
Cost Share Grant Contract
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3147
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />t <br />• <br />approval to install the practices according to approved designs. The BMP installation must meet <br />all design criteria before it can be certified as complete by IRSWCD/NRCS staff. Routine <br />consultation with NRCS/IRSWCD staff throughout the installation process is advised. <br />Once installation is complete the grower shall provide the IRSWCD all of the appropriate <br />documentation. The IRSWCD will then submit all of the documentation to the Board for <br />authorization of reimbursement to the grower. <br />The IRSWCD will provide FDACS with quarterly reports. These reports will include: a <br />summary of all work accomplished, the number of acres enrolled in each practice, the amount of <br />program funds distnbuted to date, a summary of the amount of program funds used as non- <br />federal match, the amount of federal matching funds applied to this program through USDA <br />conservation programs, and all of the invoices supporting the distnbution of program funds. <br />PROGRAM FUNDING PRIORITIES: <br />Project funds for each year will be distributed to applicants based upon the Environmental <br />Benefits Index (EBI) ranking delineated below. <br />BMP <br />• <br />Environmental Benefit Index <br />1. On-site Water Detention/Retention <br />2. Conversion or Repair of Flashboard Riser Water Control Structure <br />3. Precision Application Equipment <br />4. Portable Agrichemical Mixing Station <br />5. Chemigation Infrastructure <br />6. Aquatic Weed Barrier <br />7. Permanent Agnchemical Washdown Station <br />8. Water Table Observation Well <br />9 Grade Stabilization Structure <br />10. Conversion to Microirrigation <br />DELIVERABLES: <br />• <br />POINTS <br />100 each <br />25 each <br />20 each <br />20 each <br />20 each <br />10 each <br />10 each <br />5 each <br />5 each <br />1 point per acre <br />1. Quarterly reports as described above will be provided to the FDACS Project Manager in <br />hard copy and electronic format. <br />2. A detailed Final Annual Report will be provided to the FDACS Project Manager in hard <br />copy and electronic format. This report will consist of a detailed summary of the <br />information included in the quarterly reports and an assessment of the overall success of <br />the program. <br />03/05/02 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.