Laserfiche WebLink
ENVIRONMENTAL SERVICES. INC. <br /> CONTRACT FOR SERVICES <br /> ESI PROJECT N0 , EP04146PRO <br /> The following Contract for Services is an agreement between Environmental Services, Inc ., (ES0 <br /> and Masteller & Mo ler, Inc. , (Client) with the tern' s specified herein. Client agrees that the <br /> company/individual signing this agreement has the ability to compensate ESI for the work described <br /> whether or not the proposed project materializes . E SI agrees to perform the following tasks for the <br /> associated fee. <br /> Project Name : CR Route 512 Roadway Improvements, Phase III (Roseland Road to <br /> Sebastian River Middle School) and Phase IV (Sebastian Middle School to <br /> I-95) Indian River County, Florida <br /> Project Location : Indian River County, Florida <br /> SCOPE OF SERVICES <br /> Task 1 . Conduct Site inspection and Ecological Assessment FELE <br /> 52,000 <br /> ESI scientists will conduct pedestrian surveys of the realignment corridor to <br /> map approximate location or boundaries of vegetative communities, exotic <br /> vegetation, wetland areas which will be considered jurisdictional by U. S . <br /> Army Corps of Engineers (CE) or St. Johns River Water Management District <br /> (SJRWMD), any observation or indication of occurrence or habitat of <br /> protected plant(s) or animal (s), and any other apparent significant <br /> environmental resources. Any occurrences will be noted in field books and <br /> will be mapped on an aerial photograph of the property. <br /> Note: This task does not include review for proposed storm water ponds. <br /> Task 2. Environmental Assessment Report <br /> $2,000 <br /> EST scientists will prepare a formal environmental assessn' ent report . The <br /> report will include descriptive text and graphics which will describe methods <br /> used and results obtained during the assessment. Three copies of the report <br /> will be provided to the Client . <br /> Task 3 . Wetland Delineation <br /> $1 ,500 <br /> ESI scientists will delineate wetlands along the southern portion of the <br /> realignment corridor approximately 200 feet off the existing right-of-way. CE <br /> and SJRWM.D wetlands will be delineated by flagging with a sketch map <br /> provided to engineer for horizontal location . <br /> Note: This task does not iftlude delineation for potential stormwaterponds_ <br />