My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-348
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 11:41:40 AM
Creation date
9/30/2015 10:12:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
10/03/2006
Control Number
2006-348
Agenda Item Number
11.I.7.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Addendum No.2/Work Order No.6 -Kings Highway extension south
Area
County line at 25th Street SW
Supplemental fields
SmeadsoftID
5890
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.t <br /> j 11, '7 <br /> Board of County Commissioners d w C, - <br /> 1810 25th Street <br /> Vero Beach, Florida 32960 <br /> Telephone: (772) 567.8000 FAX : (772) 778.9391 <br /> Indian River County Project No. 0446 <br /> Kings Highway Extension (58th Avenue) South, Phase 1 <br /> Oslo Road to 17`" Street SW and extension to 21 " Street SW <br /> ADDENDUM No. 2 to WORK ORDER NO . 6 <br /> FOR <br /> PROFESSIONAL SURVEYING SERVICES AGREEMENT <br /> FOR ANNUAL SURVEYING AND MAPPING SERVICES <br /> WITH <br /> KIMLEY- HORN & ASSOCIATES, INC. <br /> In accordance with Contract No . 0390 <br /> This Addendum No. 2 to Work Order No . 6 is in accordance with the existing AGREEMENT <br /> dated September 23 , 2003 , and the extension thereof, between Kimley- Horn & Associates , <br /> Inc . (SURVEYOR ) and Indian River County (COUNTY) . <br /> This Addendum No. 2 Work Order No . 6 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS : Kings Highway Extension South (5e Avenue), Phase 1 <br /> The SURVEY LIMITS shall begin at a point on Kings Highway that is 1500' south of 17th Street <br /> SW and continue south on Kings Highway to a point that is 1000' south of 21 " Street SW <br /> (approximately 2 , 100' ) . Lateral B Canal will be surveyed for a distance of 500 ' north and 500' <br /> south of the following intersections; 131h Street SW , 17" Street SW and 21s' Street SW . <br /> (approximately 3 , 000') . Canal B-8, Canal B-9 and Canal B- 10 will be surveyed for a distance of <br /> 200 ' east and 200 ' west of Kings Highway/Lateral B Canal (approximately 1 , 200 ') . Project <br /> Survey Control ( Baseline) shall extend to and connect to the County line at 25' street S .W . <br /> SECTION II — SCOPE OF SERVICES <br /> The existing Kings Highway Extension (58th Avenue) South , Phase 1 Topographic and Control <br /> Survey that was completed on October 5 , 2005 by Kimley- Horn and Associates , Inc . will be <br /> revised to include the following : <br /> 1 ) Additional cross section elevations of Kings Highway will be obtained from a point that is <br /> 1500' south of 17th Street SW and continue south on Kings Highway to a point that is <br /> 1000 ' south of 215` Street SW (approximately 2 , 100 ') . <br /> 2) Additional cross-section elevations of Lateral B Canal will be obtained at 50 ' intervals , for <br /> a distance of 500' north and 500' south of the following streets ; 13th Street SW, 17th <br /> Street SW and 21 " Street SW . (total distance for Lateral B Canal cross-sections is <br /> 3 ,000 ') . <br /> 3 ) Retracement of Sections 32 and 33 , Township 33 South , Range 39 East , including the <br /> field location of controlling section , tract and individual boundary corner monuments in <br /> order to map those right of way and parcel lines within the project limits . <br /> 4) Location of the Indian River County Benchmarks within the project limits . <br /> 5) Location of the control point' s established/mapped by Nick Miller, Inc . at the corners of <br /> Sections 32 and 33 , Township 33 South , Range 39 East. <br /> 6) Establishment of field baseline and references along Kings Highway within the project <br /> limits. Project Survey Control (Baseline) shall extend to and connect to the County line at <br /> 251h street S .W . <br /> 7) Preparation of Certified Corner Records for the controlling monumentation within <br /> Sections 32 and 33, Township 33 South , Range 39 East. <br /> SECTION III - TIME FOR COMPLETION <br /> Addendum No. 2 tasks shall be completed within 90 calendar days from Notice to Proceed . <br />
The URL can be used to link to this page
Your browser does not support the video tag.