My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-411
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 2:44:16 PM
Creation date
9/30/2015 10:23:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/05/2006
Control Number
2006-411
Agenda Item Number
14.B.4.
Entity Name
Florida Tire Recycling, Inc.
Subject
Addendum to Contract - SWDD - 2006/2007
Supplemental fields
SmeadsoftID
5979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORIGINAL <br /> Florida Tire Recycling, Inc. Ad , <br /> 9675 Range Line Road 1�i <br /> Port St. Lucie, FL 34987 <br /> Ph: 772/465-0477 ►� V' <br /> Fx: 772/489-2124 <br /> Email: ftri@earthlink.net 'yelin�� <br /> October 9, 2006 A�� 1>• >f0��� <br /> Polly Kratman ' <br /> Indian River County 20Q6 <br /> Solid Waste Disposal District - <br /> 1325 74a` Avenue, SW <br /> Vero Beach, FL 32968 49Z ��yLL� <br /> Re: Waste Tire Recycling <br /> Dear Ms. Kratman, <br /> We appreciate the opportunity to renew our waste tire recycling agreement for the 2006/2007 fiscal <br /> year. As requested I am writing to detail the terms of our agreement, which will be offered into the <br /> coming year as follows, <br /> 1 . As waste tires are received, they should be separated into rimmed and derimmed piles <br /> 2. When a load of tires has accumulated, FTR will dispatch an open topped, walking floor trailer <br /> ( 100 cubic yard capacity.) SWDD personnel using a front-end loader will load the trailer with <br /> either the rimmed or derimmed piles of tires. <br /> 3 . FTR will not be obligated to take any tires larger than 1200 x 20 in size. <br /> 4. The tipping fee at FTR's Port St. Lucie waste tire processing facility for loads from Indian River <br /> County is $80.00 per ton with a minimum of $800.00 per load. The fee applies to all tires <br /> received whether rimmed or denmmed. <br /> 5 . Transportation from Indian River County to Port St. Lucie will be an additional $ 150.00 per <br /> load. <br /> 6. For rimmed tires only, there will be an additional charge of $ 150.00 per load for derimming by <br /> FIR at the Port St. Lucie facility. Scrap metal resulting from the derimming will be the property <br /> of FTR. <br /> 7 . There will be a fuel surcharge of 10.0% of the total cost (tipping fee, transportation and <br /> derimming costs) so long as the cost for less than truckload bulk delivery of diesel fuel remains <br /> above $2.00 per gallon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.