My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-142
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 1:51:09 PM
Creation date
9/30/2015 6:36:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/24/2003
Control Number
2003-142
Agenda Item Number
7.Y.
Entity Name
TLC Engineering
Subject
Chiller replacement for administration building
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3276
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J INDIAN RIVER COUNTY <br /> ADMINISTRATION BUILDING CHILLER REPLACEMENT l � <br /> AGREEMENT Q O � ` A <br /> THIS AGREEMENT made and entered into this day of Q , 2001 <br /> by and between TLC Engineering 874 Dixon Boulevard Cocoa, orida 32922-5809 hereinafter <br /> called the ENGINEER and INDIAN RIVER COUNTY herein called the OWNER. <br /> WITNESSED : That whereas, the OWNER and the ENGINEER for the consideration hereinafter named, <br /> agree as set forth below: <br /> Article 1 . SCOPE OF WORK <br /> Provide professional engineering services , Electrical and Mechanical for the installation of a one air <br /> cooled chiller (Trane base of design), new pumps and modification to the existing chilled water piping . <br /> The design work shall include, but not be limited to the following : <br /> Removal of existing water cooled chiller, mechanical room piping, cooling tower and pumps . <br /> Installation of the new chiller, pumps, pipes, and accessories . <br /> Modifications to the existing chilled water system. <br /> Demolition of the existing cooling tower enclosure and construction of new mounting pad as <br /> needed to accommodate new equipment <br /> Modifications of existing electrical service as necessary to accommodate the new equipment <br /> Note : The building chilled water loop will not be modified . <br /> All work shall be in conformance with Florida Building Code 2001 <br /> Construction Administration shall include, but not be limited to the following: <br /> Bid negotiations <br /> Shop drawing review <br /> Responses to RFI ' s <br /> Weekly construction meetings <br /> Pay request review <br /> Status reports <br /> Construction inspections <br /> Submittals: <br /> All work will on AutoCAD (2000) generated drawings <br /> Written specifications will provided and shall be include as a separate package. <br /> TLC will submit, For bidding purposes, 10 sets of final blueline drawings and specifications of the <br /> of proposed Division 15 and 16 work . <br /> Two (2) sets of review check prints at approximately 75 % design ( 1 l "x 17"prints) . <br /> One ( 1 ) copy of all final drawings on electronic media (Auto CAD 2000) . <br /> Design Meetings <br /> One meeting at the 75% design phase is included . <br />
The URL can be used to link to this page
Your browser does not support the video tag.