My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-326
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:44:34 AM
Creation date
9/30/2015 9:10:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/04/2005
Control Number
2005-326
Agenda Item Number
7.Y.
Entity Name
Ecotech Consultants, Inc.
Subject
Wetlands Maintenance Services Agreement
Supplemental fields
SmeadsoftID
5187
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> I . MONITORING RESPONSIBILITIES <br /> Presented below are a series of tasks that are necessary for the successful operation of <br /> the Wetland Treatment System (WTS ) located at West Regional Wastewater Facility : <br /> A . PREPARATION OF QAP . The Contractor shall prepare , maintain and /or update a <br /> Quality Assurance Program (QAP ) as required by the Florida Department of Environmental <br /> Protection , ( FDEP ) , operating permit for the sampling procedures outlined below . <br /> Sampling and testing shall be performed by qualified personnel . <br /> B . ON - SITE WATER QUALITY SAMPLING . The Contractor shall collect a water sample <br /> from the effluent structure of the wetland system on a weekly basis , deliver the sample to <br /> the West Regional Operations Lab for same day courier pick- up , and perform field tests for <br /> dissolved oxygen , temperature , and conductivity readings at the effluent structure . The <br /> Contractor also shall collect samples at five ( 5 ) water quality stations with the wetland <br /> system over a three consecutive day period every month . All samples shall be delivered to <br /> the West Regional Operations Lab for same day courier pick- up , located at the 8405 8th <br /> Street facility for transport to the County' s Contract Lab Service , for analysis . The <br /> Contractor shall be responsible for reviewing the data prior to preparation of the monthly <br /> report , and shall assist the County with the preparation of the monthly reports to FDEP . <br /> C . OFF -SITE WATER QUALITY SAMPLING . The Contractor shall collect water quality <br /> samples and field data at five ( 5 ) off-site stations , on a quarterly basis . The samples shall <br /> be delivered to the West Regional Operations Lab for same day courier pick- up , located at <br /> the 8405 8th Street facility , for transport to the County' s Contract Lab Service , for analysis . <br /> D . VEGETATIVE MONITORING . The Contractor shall provide one ( 1 ) aerial photograph , <br /> (color infrared stereo transparencies , 1 " = 200 ft) , of the wetland site on an annual basis . <br /> The Contactor shall set up and operate the transects within the wetland as per the <br /> engineering report . Total vegetation monitoring stations for all transects is 300 stations , <br /> and shall be used , in conjunction with the aerial photograph , to develop vegetation maps <br /> for the wetland . The vegetation maps shall be submitted to FDEP on an annual basis as <br /> part of the annual report . The Contractor shall operate six ( 6 ) biomass plots for the <br /> dominant macrophytic vegetation . Biomass samples shall be collected from each plot on a <br /> quarterly basis ; each sample shall be sorted by species , and weighed to the nearest 0 . 1 <br /> mg . The Contractor shall collect four (4 ) sub-samples for chemical analysis . ( Samples to <br /> include both above and belowground structures ) . The biomass data shall be reported to <br /> FDEP on an annual basis as part of the annual report for the wetland system . <br /> E . SOIL SAMPLING . The Contractor shall operate six ( 6 ) soil -sampling plots within the <br /> wetland system . The Contractor shall collect one sample from each station on an annual <br /> basis . The Contractor shall deliver the soil samples to an independent laboratory for <br /> analysis . The soil data shall be reported to FDEP on an annual basis as part of the annual <br /> report for the wetland system . <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.