My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-009
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 1:39:20 PM
Creation date
9/30/2015 8:07:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/03/2006
Control Number
2006-009
Agenda Item Number
11.I.1
Entity Name
Arcadis G & M, Inc.
Subject
Widening of 20th. Ave. from 25th. St. SW to 21st.Street SW
Project Number
0541
Supplemental fields
SmeadsoftID
4442
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Scale : <br /> The design plans sheets will be drawn at a scale of 1 " = 40' . <br /> 2 . All plan sheets shall be 11 " x 17 " . <br /> 3 . The design plans will be submitted to the COUNTY for review at the 30% , 90% and 10011/0 <br /> stages of design . Permit application submittals will be made subsequent to the 90 % plan set <br /> submittal approval by the COUNTY . <br /> D . Computation Book <br /> The 100% submittal shall include a computation book with quantity calculations for all pay items . <br /> E . Drainage Plans <br /> 1 . Drainage Parameters : <br /> Perform drainage investigations and analysis necessary to prepare a design, which will drain the <br /> project in accordance with the COUNTY, IRFWCD and SJRWMD design criteria . <br /> 2 . Environmental Permits : <br /> The ENGINEER shall prepare stormwater permit application for the St. Johns River Water <br /> Management District, IRFWCD , FDEP and US Environmental Protection requirements for <br /> submittal by the COUNTY . This will consist of all required evaluation, design, coordination, <br /> and follow-up work necessary to support permit applications . The COUNTY will review the <br /> permit applications as necessary . The ENGINEER shall assemble and be responsible for the <br /> final submittal. <br /> The ENGINEER shall prepare permit sketches for submission by the COUNTY to Florida <br /> Department of Environmental Protection, U . S . Army Corps of Engineers, IRFWCD and St. <br /> Johns River Water Management District for Dredge and Fill activities , if necessary . The <br /> ENGINEER shall submit all permit sketches on 8 " x 11 " sheets . Sketches shall be neatly scaled, <br /> signed and sealed, and reproducible . <br /> 3 . Utilities : <br /> Utility coordination with the various Utility Companies and/or agencies shall be by the <br /> ENGINEER and identified conflicts addressed . <br /> F . Construction Phase Assistance <br /> Construction Phase Assistance is not included in this agreement, but will be provided by the Engineer <br /> if requested by the County. The scope and fees for this work will be negotiated at a later date. <br /> SECTION IV - TIME FOR COMPLETION <br /> Page 6 of 12 <br /> C : Documents and Settings' Weibel . ARCADIS41S` Local SettingsTemporary Internet Files Ot K903 `.041 20th Ave Pro 1essionalServices Agr- <br /> Arcadis - 12-6-05 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.