My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-300
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 12:04:43 PM
Creation date
9/30/2015 9:05:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/06/2005
Control Number
2005-300
Agenda Item Number
11.I.4
Entity Name
Arcadis G&M, Inc.
Subject
Bridge Replacements Widening of 66th Ave.
Area
66th Ave. South of SR 60 North of 45th St.
Supplemental fields
SmeadsoftID
5153
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G . Construction Phase Assistance <br /> Construction Phase Assistance is not included in this agreement, but will be provided by the Engineer <br /> if requested by the County. The scope and fees for this work will be negotiated at a later date. <br /> G . Certification <br /> 1 . The ENGINEER will provide certification to IRFWCD , St. Johns River Water Management <br /> District and all other required Federal, State, and local permitting agencies based on As-Built <br /> drawings provided by the Contractor ' s licensed surveyor and information provided by the <br /> COUNTY . <br /> SECTION IV - TIME FOR COMPLETION <br /> The time for completion of the 90% design drawings, permit applications, and Engineer' s Opinion of Probable <br /> Construction Cost for the project shall be sixteen ( 16) months . Once permits are received, 100% design drawings shall be <br /> completed 90 days thereafter. <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this <br /> Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the COUNTY follows : <br /> The following is a summary of costs: <br /> Geotechnical Services (Tierra)............. . . . . . . . .. .......... . . . . ........ . . . . . . . . 0000 $50, 500. 00 <br /> Engineering (ARCADIS.) ......... . .. . . . . . . . . . . . . . .......... . . . . . . . . . . . . ....... . . . . $3109800. 00 <br /> Design Survey (ARCADIS) ... . . . . . . . . . . . . . . . . .. ........... . . . . . . . . . . . . . ........ . . . . . . . . $104, 500. 00 <br /> Right-of- Way Survey and Map . . . . . . . . . . . .. . .. ........ . . . . . . . . . . . . . . . . ........ . . . . . . . . . $62, 000. 00 <br /> Structural Design for 3 bridges (Bridge Design Associates, Inc.) .. $ 73, 970. 00 <br /> TOTAL PROFESSIONAL SERVICES . . . . . . . . . .. ...... .. . . ..... . . . . . . . . . . 4000. $601, 700. 00 <br /> Page 9 of 15 <br /> F : \Public Works\Capital Projects\66th Avenue SR60-45th St\66th Ave ProfessionalServices AGR REV 8 -4-05 Ldoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.