My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-097
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 3:44:50 PM
Creation date
9/30/2015 9:35:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2006
Control Number
2006-097
Agenda Item Number
11.J.5.
Entity Name
Arcadis G&M, Inc.
Subject
Professional Services, part 1 of 3
Supplemental fields
SmeadsoftID
5536
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> ATTACHMENT 1 <br /> INDIAN RIVER COUNTY <br /> UTILTITIES DEPARTMENT <br /> ROCKRIDGE SEWER SYSTEM <br /> VACUUM SEWER SYSTEM IMPROVEMENTS <br /> SCOPE OF SERVICES <br /> ARCADIS will provide professional engineering services for the planning, design and services during <br /> construction for the vacuum sewer system improvements for the Rockridge Subdivision as outlined on the <br /> enclosed exhibit and is for Indian River County (CLIENT) . This is to be referred to as the PROJECT to which <br /> this SCOPE applies. The services to the CLIENT will include serving as the Professional Engineer for the <br /> PROJECT, providing professional engineering consultation and advice in furnishing customary engineering <br /> services in relation to the planning, design, permitting, and construction services for the Rockridge Subdivision <br /> Project. <br /> PROJECT <br /> A vacuum sanitary sewer system will be designed for the collection of wastewater along the rights-of-way <br /> within the Rockridge Subdivision . This project will require the construction of approximately 20,000 linear <br /> feet of vacuum sewer piping complete with approximately 210 valve chambers and all necessary surface <br /> restoration . The project will also include a vacuum pump station and force main from the vacuum pump <br /> station to the existing force main system. Plans for removing the existing low pressure system from service will <br /> also be included. <br /> A. Preliminary Design Phase <br /> Data Gathering, Evaluation and Preliminary Design <br /> This task focuses on obtaining the necessary preliminary information required to prepare detailed <br /> engineering plans and specifications. <br /> I . Collect data available on existing facilities, including field conditions, record drawings, force <br /> main location, operating pressures, pipe size and current flow conditions. <br /> 2. Meet with appropriate CLIENT staff to discuss project requirements for road restoration, <br /> acquisition of easements, land purchase, construction details, temporary flow monitoring <br /> installations, standard equipment, and construction documents. <br /> 3 . Deliverable - Preliminary Design Report (Memorandum) <br /> Prepare a design memorandum outlining all of the design criteria to be used during the design <br /> of the vacuum sewer collection system. This report shall be agreed upon by both parties as the <br /> design criteria for the project. <br /> Page 1 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.