Laserfiche WebLink
E . Easements <br /> 1 . For services enumerated in Article 1 , Section D - Easements, the hourly rate specified• in <br /> Table A for personnel working directly on the project plus direct expenses in connection <br /> therewith. There is no upset limit proposed for this portion of the work. <br /> The budget for direct expenses in the design phase is $40,000. 00 <br /> These fees have been determined in accordance with the scope of work breakdown attached. <br /> This proposal does not include the provision of the following items : <br /> Any hydrogeologic work required for the design of the dewatering systems or to evaluate the <br /> impact of construction dewatering systems for contamination sites within a quarter-mile <br /> radius of this project site. <br /> Easement acquisitions and legal work as required. <br /> Payment of permitting fees. <br /> ARTICLE 3 - DATA OR ASSISTANCE TO BE PROVIDED BY CLIENT <br /> A . Provide copies of existing record drawings for all water and wastewater facilities impacted in the <br /> project areas. <br /> B . Provide assistance with regulatory agencies and payment of all permitting fees. <br /> C . Provide assistance with final location of vacuum station site. <br /> (Remainder of this page left blank intentionally) <br /> Page 8 of 17 <br />