TABLE 4 <br /> VACUUM SEWER SYSTEM IMPROVEMENTS <br /> LIST OF PROJECT DELIVERABLES <br /> PRELIMINARY DESIGN PHASE <br /> A . Design Location Survey <br /> B . Geotechnical Investigation <br /> C . Boundary and Topographic Survey <br /> D Public meeting <br /> E. Preliminary Design Report (25 % Design). Five sets for review by CLIENT. <br /> FINAL DESIGN PHASE <br /> A. 50% Design Submittal <br /> Project specific documents including drawings on l l x 17 sheets and specifications on 8- 1 /2 x <br /> I I sheets for review by CLIENT. Five (5) sets, 50% complete. <br /> B . 75 % Design Submittal <br /> Project specific documents including drawings on 11 x 17 sheets and specifications on 8- 1 /2 x <br /> I 1 sheets for review by CLIENT. Five (5) sets, 7590 complete. <br /> C. 100% Design Submittal <br /> Project specific documents including drawings on I l x 17 sheets and specifications on 8- 1/2 x <br /> I 1 sheets for review by CLIENT. Five (5) sets, 100% complete . <br /> D . Final Design Submittal <br /> Project specific documents including drawings on 22 x 34 sheets and project specific <br /> specifications on 8- 1 /2 x I 1 loose sheets for reproduction by CLIENT. <br /> Final estimate of probable construction cost. <br /> CONSTRUCTION PHASE <br /> A. Shop Drawings <br /> 2 Copies of accepted and final shop drawings. <br /> Page 15 of 17 <br />