Laserfiche WebLink
2 . The ENGINEER will attend conferences with the CC UNTY and its <br /> representatives upon reasonable request . <br /> 3 . In order to accomplish the work described under this Agreement in the time <br /> frames and conditions set forth in this Agreement, the ENGINEER will <br /> observe the following requirements : <br /> a. The ENGINEER will complete his work on the pr ject within the <br /> time allowed by maintaining an adequate staff of regi tered engineers, <br /> draftsmen, and other employees on the work at all times . <br /> b . The ENGINEER will design the project in such a manner as to be in <br /> conformance with all applicable federal , state and local laws . The SR <br /> 60 corridor is a state/Federal Highway and design mast meet FDOT <br /> criteria. 43 `d Avenue is a County agCiial ioadway aiid dcsign shall <br /> meet FDOT Greenbook Standards . All canals are IRFWCD <br /> jurisdiction and must meet IRFWCD criteria. <br /> c. The ENGINEER will prepare all necessary sketches and completed <br /> application forms to accompany the COUNTY' S applications for <br /> required federal , state, or local permits . <br /> d . The ENGINEER will cooperate with the COUNTY in order that all <br /> phases of the work may be properly scheduled and coordinated. <br /> e. The ENGINEER will send a complete preliminary set of construction <br /> plans to any city, county, state or federal regulatori agency from <br /> which a permit or other approval is required prior to final approval of <br /> the design by the Director of the Public Works Depariment, and will <br /> coordinate the project design with all applicable agencies , <br /> £ The ENGINEER will contact all known utility companies having <br /> installations in the immediate vicinity of the propo ed work and <br /> consider relocation of utilities, if necessary. The E GINEER will <br /> provide the COUNTY with necessary information relative to required <br /> utility adjustments, relocations and installations and will show all <br /> existing utilities on the final design plans . <br /> Design modifications to existing COUNTY utility lines, if necessary, <br /> may be negotiated by a separate agreement with the County Utility <br /> Department, or the County Utilities Department may design <br /> modifications with Utility Department Staff or other consultants . <br /> g. The ENGINEER shall report the status of this project to the Director <br /> of the Public Works Department upon request and hold all drawings, <br /> calculations and related work open to the inspection oft e Director or <br /> his authorized agent at any time, upon reasonable reques . <br /> Page 3 of 14 3 <br />