My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-388
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-388
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 11:23:46 AM
Creation date
9/30/2015 11:27:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/06/2007
Control Number
2007-388
Agenda Item Number
14.A.4
Entity Name
Barth Construction
Subject
Fire Station #9
Area
1640 U.S.Highway 1 Station #9
Supplemental fields
SmeadsoftID
6684
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 1 .4.6 Providing special surveys , environmental studies , and submissions required for <br /> approvals of governmental authorities or others having jurisdiction over the Project. <br /> § 1 .4.7 Providing services relative to future facilities , systems and equipment. <br /> § 1 .4.8 Providing services at the Owner's specific request to perform detailed <br /> investigations of existing conditions or facilities or to make measured drawings thereof. <br /> § 1 .4.9 Providing services at the Owner's specific request to verify the accuracy of <br /> drawings or other information furnished by the Owner. <br /> § 1 .4. 10 Coordinating services in connection with the work of separate persons or entities <br /> retained by the Owner, subsequent to the execution of this Part 1 Agreement . <br /> § 1 .4 . 11 Providing analyses of owning and operating costs . <br /> § 1 .4. 12 Providing interior design and other similar services required for or in connection <br /> with the selection , procurement or installation of furniture , furnishings and related <br /> equipment . <br /> § 1 .4. 13 Providing services for planning tenant or rental spaces . <br /> § 1 .4. 14 Making investigations , inventories of materials or equipment, or valuations and <br /> detailed appraisals of existing facilities . <br /> ARTICLE 2 OWNER <br /> § 2 . 1 RESPONSIBILITIES <br /> § 2. 1 . 1 The Owner shall provide full information in a timely manner regarding <br /> requirements for the Project, including a written program which shall set forth the Owner's <br /> objectives , schedule , constraints and criteria . <br /> § 2 . 1 .2 The Owner shall establish and update an overall budget for the Project, including <br /> reasonable contingencies . This budget shall not constitute the contract sum . <br /> § 2. 1 . 3 The Owner shall designate a representative authorized to act on the Owner's <br /> behalf with respect to the Project. The Owner or such authorized representative shall <br /> render decisions in a timely manner pertaining to documents submitted by the <br /> Design/Builder in order to avoid unreasonable delay in the orderly and sequential <br /> progress of the Design/Builder's services . The Owner may obtain independent review of <br /> the documents by a separate architect, engineer, contractor, or cost estimator under <br /> contract to or employed by the Owner. Such independent review shall be undertaken at <br /> the Owner's expense in a timely manner and shall not delay the orderly progress of the <br /> Design/Builder's services . <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.