My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-303
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 2:16:41 PM
Creation date
9/30/2015 11:08:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/11/2007
Control Number
2007-303
Agenda Item Number
11.J.2
Entity Name
Black Diamond Enterprises, LLC
Vero Cadillac Developer
Subject
Water Main Extension
Area
13th Lane
Supplemental fields
SmeadsoftID
6553
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> EXHIBIT B <br /> PROJECT COST ESTIMATING <br /> Project : 13th Lane Water Main Extension MBV Job #05-420 <br /> Description : Construct 6" Diameter PVC Water Main in 13th Lane and Abandon 6" Asbestos-Concrete Line on Private Property <br /> Date : 8/10/07 <br /> Estimate Costs <br /> Bid Item Estimated Unit of Unit Total <br /> Description Quantity Measure Price Price <br /> EARTHWORK <br /> Mobilization/Demobilization 1 LUMP SUM 51 ,000.00 51 ,000 <br /> Maintenance of Traffic I LUMPSUM 51 ,500.00 $ 1 ,500 <br /> Site Preparation I LUMP SUM 51 ,000.00 $ 1 ,000 <br /> Pavement Removal 175 SY S2.00 $350 <br /> Regular Excavation 234 CY SL75 $410 <br /> Silt Fence 800 LF S1 .50 $ 1 .200 <br /> Turbidity Barriers 50 LF $6.00 $300 <br /> Final Gradine and Restoration 4,260 SY $0.40 $ 1 ,704 <br /> Seed and Mulch 1654 SF $0. 10 $265 <br /> WATER DISTRIBUTION <br /> 6" PVC C900 DR- 18 Water Main 843 LF $7.50 $6,323 <br /> 6" Gate Valve 4 EA S500.00 $2,000 <br /> D. I. Fittings 1 I LUMP SUM $2.000.00 $2,000 <br /> 6" Line Stops 2 EA $2,000.00 $4,000 <br /> Restraining 1 LUMP SUM $2,500100 $2,500 <br /> MISCELLANEOUS <br /> 4" Thick Sidewalk 200 SF $2.00 $400 <br /> 6' Chain Link Fence Replacement 225 LF $8. 00 1 .80011 <br /> Re alar Du 3" Type S Asphalt 175 SY $ 16.00 $2,800 <br /> PERMITTING <br /> Permit Fee - FDEP Water Distribution I Allowance $250.00 S2501 <br /> —_ I <br /> Total Est. Construction Cost : 529,80111 <br /> Contingency Account (by Change Order)l 10.00% 52,980 <br /> Surveying Services : 4.00% $ 1 , 192 <br /> Field Survey - SO <br /> Title Search - So <br /> Easement Description - SO <br /> Land / ROW Acquisition - soI <br /> Design Servicesr2 8.00% 52384 <br /> Ref: ASCE, Figure 2 - Curve B <br /> Permitting Services n 1 .50% $447 <br /> Biddin > & Award Services a> 0. 75% $224 <br /> Advertisement - $0 <br /> Printing - $0 <br /> Postage & Mailings - $0 <br /> Services During Construction (c� 3 .00% $894 <br /> ESTIMATED PROJECT COST : $37,922 <br /> Slewn-DIi brarynz EV ISCD Cast [st 9 10-1)-, x1s <br />
The URL can be used to link to this page
Your browser does not support the video tag.