Laserfiche WebLink
3 . 3 .21 3 .4. 3 , 3 . 8 . 1 , 3 .9, 3 . 18 .29 4. 2 . 39 4. 2 . 61 10. 21 10. 3 , 6 . 2 . 5 , 3. 14 <br /> 11 . 1 . 19 11 .4.71 14. 11 14.2 . 1 . 19 Damage to Construction of Owner or Separate <br /> Contractor's Liability Insurance Contractors <br /> 11 . 1 3 . 14 .2, 6 . 2 .47 9 .2. 1 .5 , 10. 2 . 1 . 2, 10. 2 .5 , 10. 61 11 . 1 , <br /> Contractor ' s Relationship with Separate Contractors 11 .4, 12 .2 .4 <br /> and Owner ' s Forces Damage to the Work <br /> 3 . 12 . 5 , 3 . 14.21 4 . 2 .4, 63 11 .4. 7 , 12 , L29 12 .2 .4 3 . 14 .27 9 .9. 11 10.2 . 1 . 29 10. 2 .5 , 10 . 69 <br />11 .49 12 . 2.4 <br /> Contractor' s Relationship with Subcontractors Damages , Claims for <br /> 1 . 2 . 293 . 3 . 293 . 18 . 193 . 18 . 2, 519 . 6 . 219. 6 . 779 . 10.22 3 . 2 . 3 , 3 . 18 , 4. 3 . 1096 . 1 . 198 . 3 . 399 . 5 . 199 . 6 . <br />7910 . 3 .3 , <br /> 11 .4 . 1 . 2911 .4 .7 , 11 .4 . 8 11 . 1 . 1111 .4 . 5911 .4.7114. 1 . 3 , 14. 2 .4 <br /> Contractor' s Relationship with the Architect Damages for Delay <br /> 1 . 1 .2 , 1 . 69 3 . 1 .3 , 3 . 2 . 11 3 . 2 . 29 3 . 2 . 31 3 . 3 . 11 3 .4. 2 , 3 . 5 . 1 , 6 . 1 . 11 8 . 3 . 39 9 . 5 . 1 . 61 <br /> 9. 71 10.3 .2 <br /> 3 . 7 . 31 3 . 109 3 . 11 , 3 . 129 3 . 169 3 . 18 , 4. 1 . 21 4. 1 . 31 4 . 29 Date of Commencement of the Work, Definition of <br /> 4. 3 .4, 4 .4. 17 4 .4 .71 5 . 21 6 . 2 . 2, 79 8 . 3 . 11 9. 29 9 . 35 9.4, 8 . 1 . 2 <br /> 9. 5 , 9.79 9 . 81 9 .91 10. 2. 61 10. 35 11 . 3 , 11 .4. 71 129 Date of Substantial Completion, Definition of <br /> 13 .4.21 13 . 5 8 . 1 . 3 <br /> Contractor' s Representations Day, Definition of <br /> 1 . 5 . 21 3 . 5 . 19 3 . 12 .61 6 . 2 .21 8 .2 . 19 9 . 3 . 39 9 . 8 . 2 8 . 1 .4 <br /> Contractor' s Responsibility for Those Performing the Decisions of the Architect <br /> Work 4 . 2. 6, 4.2. 71 4. 2 . 111 4 .2 . 12, 4 .2. 139 4. 3 .49 4.4 . 19 4 .4 .5 , <br /> 3 . 3 .293 . 18 , 4. 2 . 394.3 . 815 . 3 . 1 , 6 . 1 . 316 . 2, 6 .399 .5 . 11 4.4 . 6, 4. 516 . 3 , 7 .3 .677 . 3 . 818 . 1 . 398 . 3 . 1 , 9 <br />. 219 .49 <br /> 10 9 .5 . 1 , 9 . 8 .41 9 .9 . 1 , 13 . 5 . 21 14 . 2. 21 14. 2 .4 <br /> Contractor' s Review of Contract Documents Decisions to Withhold Certification <br /> 1 . 5 .29 3 . 21 3 . 7 . 3 9 .4. 11 9.59 9 .71 14 . 1 . 1 .3 <br /> Contractor' s Right to Stop the Work Defective or Nonconforming Work, Acceptance, <br /> 9. 7 Rejection and Correction of <br /> Contractor ' s Right to Terminate the Contract 2 . 31 2.41 3 .5 . 11 4 . 2 . 6, 6. 2 . 51 9 . 5 . 11 9 .5 .29 9 . 6 .6 , 9 . 8 . 29 <br /> 4 . 3 . 10, 14. 1 9 . 9 . 399. 10 .4912.2 . 1113 .7 . 1 . 3 <br /> Contractor' s Submittals Defective Work, Definition of <br /> 3 . 10, 3 . 1173 . 1294.2.7 , 5 . 2 . 1 , 5 . 2 . 397 . 3 . 699 .2, 9. 31 3 . 5 . 1 <br /> 9 . 8 . 21 9 . 8 . 39 9 .9 . 1 , 9 . 10 . 2 , 9 . 10. 31 11 . 1 .3 , 11 . 5 .2 Definitions <br /> Contractor ' s Superintendent 1 . 1 , 2 . 1 . 11 3 . 11 3 . 5 . 1 , 3 . 12 . 11 3 . 12. 21 3 . 12 . 31 4 . 1 . 1 , <br /> 3 . 99 10. 2 . 6 4 . 3 . 1 , 5 . 196 . 1 . 297 .2 . 117 . 3 . 1 , 7 . 3 . 618 . 19 9 . 19 9 . 8 . 1 <br /> Contractor' s Supervision and Construction Delays and Extensions of Time <br /> Procedures 3 . 2 . 3 , 4. 3 . 11 4. 3 .4 , 4 . 3 . 7 , 4 .4. 5 , 5 . 2 . 31 7 . 2 . 1 , 7 . 3 . 1 , <br /> 1 . 2 .293 . 393 .4, 3 . 12 . 10, 4 . 2 .214 . 2 . 7 , 4. 3 . 3 , 6 . 1 . 37 7 .4. 1 , 8.3, 9 .5 . 199 .7 . 19 10. 3 .21 10 . 6 . 1 , <br /> 14. 3 .2 <br /> 6 . 2 .41 7 . 1 . 37 7 .3 .49 7 . 3 . 69 8 . 2, 107 12, 14 Disputes <br /> Contractual Liability Insurance 4 . 1 .49 4. 39 4 .4, 4.59 4.69 6. 31 7 .3 . 8 <br /> 11 . 1 . 1 . 8 , 11 .29 11 . 3 Documents and Samples at the Site <br /> Coordination and Correlation 3. 11 <br /> 1 .29 1 .5 . 27 3 .3 . 19 3 . 10, 3 . 12 .6, 6 . 1 .39 6 .2. 1 Drawings, Definition of <br /> Copies Furnished of Drawings and Specifications 1 . 1 . 5 <br /> 1 . 6, 2 . 2 . 59 3 . 11 Drawings and Specifications, Use and Ownership of <br /> Copyrights 1 . 1 . 1 , 1 . 39 2 . 2. 5 , 3 . 111 5 .3 <br /> 1 . 6, 3 . 17 Effective Date of Insurance <br /> Correction of Work 8 . 2 . 2, 11 . 1 . 2 <br /> 2 . 31 2.47 3 . 7 .41 4 . 2 . 11 9 .4 . 29 9 . 8 . 2 , 9 . 8 . 31 9 .9 . 19 12 . 1 .21 Emergencies <br /> 12 . 21 13 .7 . 1 .3 4. 3 .51 10.69 14 . 1 . 1 .2 <br /> Correlation and Intent of the Contract Documents Employees , Contractor' s <br /> L2 3 . 3 . 2, 3 .4. 31 3 . 8 . 11 3 .9, 3 . 18 . 29 4 .2 . 39 4. 2.6, 10.2, 10. 31 <br /> Cost, Definition of 11 . 1 . 19 11 .4.79 14 . 11 14 .2. 1 . 1 <br /> 7 . 3 .6 Equipment, Labor, Materials and <br /> Costs 1 . 1 . 3 , 1 . 1 . 6, 3 . 49 3 .5 . 11 3 . 8 .2 , 3 . 8 . 31 3 . 12, 3 . 13 , 3 . 15 . 1 , <br /> 2 .49 3 .2 . 39 3 . 7 .49 3 . 8 .21 3 . 15 .21 4 . 31 5 .4. 2, 6 . 1 . 11 6 . 2. 39 4 . 2 . 61 4. 2 .75 5 . 2 . 19 6 . 2 . 11 7 . <br />3 . 69 9 . 3 . 2 , 9 . 3 . 31 9 . 5 . 1 . 3 , <br /> 7 . 3 .3 . 32 7 . 3 .61 7 .3 .71 7 . 3 . 8 , 9 . 10. 21 10. 3 .2 , 10 .51 11 .37 9 . 10 .27 10.2 . 11 10. 2.49 14. 2 . 1 . 2 <br /> 11 .4, 12 . 11 12 . 2 . 19 12 . 2 .4, 13 . 51 14 Execution and Progress of the Work <br /> Cutting and Patching <br /> AIA Document A201 TM - 1997. Copyright ® 1911 , 1915 , 1918, 1925, 1937, 1951 , 1958, 1961 , 1963 , 1966, 1970, 1976, 1987 and 1997 <br /> by The American <br /> Institute of Architects. All rights reserved. WARNING : This AIO Document is protected by U.S. Copyright Law and International Treaties. 4 <br /> Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and <br /> will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14 :50 :06 on 08/ 10/2005 under Order <br /> No. 1000192296_1 which expires on 8/8/2006, and is not for resale. <br /> User Notes : (726890250) <br />