§ 4.6 . 5 Claims and Timely Assef!tien of Claims . The party filing a notiee of demand fof arbitration must asseFt in the
<br /> demand all .1ainis then known to that pafty an whieh ar-bitration is peffl:litted to be defnanded-.§ 4.6. 6
<br /> § 4 .6 .6 judgment on Final Awar-d . The award f:endef!ed by the af bitf!atar- or afbitfater-s shall be final, and judgment
<br /> may be entered upon it in aeeer-dance with applieable law 4ng jur-isdietion thereofl.
<br /> ARTICLE 5 SUBCONTRACTORS
<br /> § 5.1 DEFINITIONS
<br /> § 5. 1 . 1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the
<br /> Work at the site . The term " Subcontractor" is referred to throughout the Contract Documents as if singular in
<br /> number and means a Subcontractor or an authorized representative of the Subcontractor. The term " Subcontractor"
<br /> does not include a separate contractor or subcontractors of a separate contractor.
<br /> § 5. 1 .2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to
<br /> perform a portion of the Work at the site . The term " Sub-subcontractor " is referred to throughout the Contract
<br /> Documents as if singular in number and means a Sub- subcontractor or an authorized representative of the Sub-
<br /> subcontractor.
<br /> § 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK
<br /> § 5.2. 1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as
<br /> practicable after award of the Contract, shall furnish in writing to the Owner through the Architect the names of
<br /> persons or entities (including those who are to furnish materials or equipment fabricated to a special design)
<br /> proposed for each principal portion of the Work. The Architect will promptly reply to the Contractor in writing
<br /> stating whether or not the Owner or the Architect, after due investigation, has reasonable objection to any such
<br /> proposed person or entity. na�e &f-y 5.2.2 The Contractor shall not contract with aproposed person or entity to
<br /> whom the Owner or Architect has made reasonable and timely objection. The Contractor shall not be required to
<br /> contract with anyone to reply pr-omptly shall eenstitute notice of no whom the Contractor has made reasonable
<br /> objection.
<br /> § 5.2.2 The ContractoF shall not eentfact with a proposed per-son or- entity to whom the Owner- or Architeet has fflade
<br /> Gentfaeter has made reasonable objeetion.
<br /> § 5.2.3 If the Owner or Architect has reasonable objection to a person or entity proposed by the Contractor, the
<br /> Contractor shall propose another to whom the Owner or Architect has no reasonable objection. If the proposed but
<br /> rejected Subcontractor was reasonably capable of performing the Work, the Contract Sum and Contract Time shall
<br /> be increased or decreased by the difference, if any, occasioned by such change, and an appropriate Change Order
<br /> shall be issued before commencement of the substitute Subcontractor' s Work. However, no increase in the Contract
<br /> Sum or Contract Time shall be allowed for such change unless the Contractor has acted promptly and responsively
<br /> in submitting names as required .
<br /> § 5.2.4 The Contractor shall not change a Subcontractor, person or entity previously selected if the Owner or
<br /> Architect makes reasonable objection to such substitute .
<br /> § 5.3 SUBCONTRACTUAL RELATIONS
<br /> § 5. 3. 1 By appropriate written agreement, written here le.g lly required for- validity, the Contractor shall require
<br /> each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor
<br /> by terms of the Contract Documents , and to assume toward the Contractor all the obligations and responsibilities ,
<br /> including the responsibility for safety of the Subcontractor ' s Work, which the Contractor, by these Documents ,
<br /> assumes toward the Owner and Architect. Each subcontract agreement shall preserve and protect the rights of the
<br /> Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor
<br /> so that subcontracting thereof will not prejudice such rights , and shall allow to the Subcontractor, unless specifically
<br /> provided otherwise in the subcontract agreement, the benefit of all rights , remedies and redress against the
<br /> Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the
<br /> Contractor shall require each Subcontractor to enter into similar agreements with Sub-subcontractors . The
<br /> Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement,
<br /> copies of the Contract Documents to which the Subcontractor will be bound , and, upon written request of the
<br /> Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may
<br /> AIA Document A201Tm — 1997. Copyright ® 1911 , 1915, 19189 19259 19379 1951 , 1958, 1961 , 1963, 1966, 1970, 1976, 1987 and 1997 by The
<br /> American
<br /> Institute of Architects. All rights reserved. WARNING : This AIO Document is protected by U.S. Copyright Law and International Treaties. 23
<br /> Unauthorized reproduction or distribution of this AIO Document, or any portion of It, may result In severe civil and criminal penalties, and will be
<br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:50 :06 on 08/10/2005 under Order
<br /> No. 1000192296_I which expires on 8/8/2006, and is not for resale.
<br /> User Notes : (726890250)
<br />
|