My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-263
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:06:31 AM
Creation date
9/30/2015 9:00:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/02/2005
Control Number
2005-263
Agenda Item Number
11.C.1
Entity Name
Chilberg Construction
Subject
Supervisor of Elections,Buildings and Grounds, Animal Control
Supplemental fields
SmeadsoftID
5112
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I § 8. 1 . 1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and <br /> Contractor, AIA Document A101 1997. A101 - 1997 , as modified . <br /> § 8. 1 .2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AIA <br /> Document A201 17.A201 - 1997, as modified attached as Exhibit A <br /> § 8 . 1 .3 The Supplementary and other Conditions of the Contract are those contained in the Architectural Project <br /> Manual dated —June 10. 2005 and afe asfellewsthe MEP Project Manual dated June 10 2005 <br /> § 8. 1 .4 The Specifications are those contained in the Architectural Project Manual and the MEP Project Manual <br /> dated as in Section 8 . 1 . 3 , and afe as fellowsi <br /> SeGfion Title p."s <br /> DOGUMORt TWO Pag" <br /> 8 . 1 .3 . <br /> § 8 . 1 .5 The Drawings form a part of the Project Manual dated as in section 8 . 1 . 3 . and are listed as shown below; <br /> (Either- list the Dr-awar-e ings here or r-efeF to an ., hilt attaghed lifellews, this A feeffient�on Exhibdated unless <br /> . different date is it B . <br /> § 8.1 .6 The Addenda,e , i f afty, s follows ! <br /> N,'.u. mrb� e_ r iYt1t� <br /> Tttle late <br /> Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding <br /> requirements are also enumerated in this Article 8 . <br /> § 8 . 1 .7 Other documents, if any, forming part of the Contract Documents are as follows : <br /> (List here any additional doeHnients that afe intended to fefm paft of the Gontr-aet AIA Document <br /> A201 1997 pr-evides that bidding r-equir-ements sueh A201 1997 as advertisement of invitation to lastfuetions to <br /> , <br /> Bidders, sample modified and the Genu ere..+ .. <br /> Y F',, ..t the C t1 t unlessoeuments _ , <br /> in this Agfeement. They should be listed hefe only if intended to be paft of the Goatfaet attached hereto <br /> as Exhibit A. <br /> AIA Document A101TM - 1997. Copyright ® 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by <br /> The American <br /> Institute of Architects. All rights reserved. WARNING : This AIAe Document is protected by U.S. Copyright Law and International Treaties. 6 <br /> Unauthorized reproduction or distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will <br /> be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:43:45 on 08/10/2005 under Order <br /> No. 1000192296_1 which expires on 8/8/2006 , and is not for resale. <br /> User Notes: <br /> (4215104205) <br />
The URL can be used to link to this page
Your browser does not support the video tag.