My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-333
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 2:27:10 PM
Creation date
9/30/2015 9:18:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/04/2005
Control Number
2005-333
Agenda Item Number
11.B.1
Entity Name
Florida Department of Community Affairs
Subject
Emergency Operations Center Grant Funding
FY 2005-06
Project Number
06CP-4Z-10-40-01
Supplemental fields
SmeadsoftID
5216
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> Proposed Budget Budget and Scope of Work <br /> Anticipated <br /> :Categorl! "Expenditure , <br /> °Amount <br /> Salary and Benefits <br /> Other Personal/Contractual Services 2 8 0 , 0 0 0 <br /> Administrative Expenses ( Limited to 5 % ) <br /> Expenses <br /> Operating Capital Outlay <br /> Fixed Capital Outlay 2 , 2 2 0 , 0 0 0 <br /> Total Expenditures $2, 5009000 <br /> L SCOPE OF WORK <br /> A. The Recipient shall construct an Emergency Operations Center ( EOC ) within the County . Eligible <br /> reimbursement costs include , but are not necessarily limited to : Architectural and Engineering services <br /> and fees ; site survey and soil testing ; necessary permits and fees ; civil and utilities site work ; access <br /> driveways and parking ; site security measures ; construction of the building ' s superstructure , shell <br /> ( envelope) and essential ancillary structures ; communications infrastructure and tower( s ) ; helipad ; special <br /> inspections ; mechanical , plumbing , electrical , telecommunications , conveying and security systems ; <br /> lightning protection ; redundant infrastructure equipment and systems (e . g . , electric generators , <br /> uninterruptible power supplies , etc . ) ; and , finish work , furnishings and equipment for emergency <br /> management staff, primary EOC spaces (e . g . , operations room , communications/radio room , information <br /> and planning room , etc. ) and shared spaces ( e . g . , conference rooms , restrooms , kitchen/dining rooms , <br /> etc . ) <br /> B . The EOC shall be constructed with sufficient space to house people and equipment for day-to- <br /> day and sustained continuous emergency operations , and capable of full staffing for the most extensive <br /> emergency anticipated . At a minimum , the EOC and essential shared -use area ( s ) shall be designed for <br /> an emergency operations staff size of no less than 75 persons per shift. <br /> C . At a minimum , the EOC shall meet the hurricane hazard safety criteria established in Standards <br /> for Hurricane Evacuation Shelter Selection (ARC 4496 ) . <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.