Laserfiche WebLink
telecommunications/information technology drawings and shall be certified by the applicable registered or <br /> licensed design professional (s) of record . <br /> E . The construction drawings shall demonstrate that the EOC will meet the hurricane hazard safety <br /> criteria of ARC 4496 , and the wind load , windborne debris impact, flood and security design requirements <br /> set forth in Scope of Work items I . 0 through I . J . Failure to supply the required documentation , or <br /> disapproval of this documentation by the Department, shall result in denial of funds . <br /> F . The Recipient shall provide final project cost data as required in Scope of Work item I . L . <br /> G . The Recipient shall provide the Department with copies of pertinent construction permits , and the <br /> certificate of occupancy upon completion of construction project. <br /> III . SCHEDULE OF WORK <br /> A. By December 31 , 2005 , the Recipient shall provide the Department with Product Item A for <br /> review and approval . Failure to supply the required documentation , or disapproval of this documentation <br /> by the Department, shall result in denial of funds . <br /> B . By March 31 , 2006 and at least on a quarterly basis thereafter, Recipient shall report on progress <br /> in relation to the initial timeline , and submit an invoice for reimbursement for work accomplished in <br /> accordance with the Department approved cost reimbursement allocation table referenced in Product <br /> Item A . <br /> C . By August 30 , 2008 , the Recipient shall provide final project cost data as set forth in Table SW-2 , <br /> certificate of occupancy , close-out documentation and final payment invoice . <br /> 23 <br />