Laserfiche WebLink
ARTICLE 7. CONTRACTOR'S REPRESENTATIONS. <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations: <br /> 7. 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents, work, site , locality, and all local conditions and laws and regulations <br /> that in any manner may affect cost, progress , performance or furnishing of the <br /> work. <br /> 7. 2 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying) all such examinations , investigations, <br /> explorations , tests, reports and studies which pertain to the subsurface or physical <br /> conditions at or contiguous to the site or otherwise may affect the cost, progress, <br /> performance or furnishing of the work as CONTRACTOR considers necessary for <br /> the performance of furnishing of the work at the Contract Price , within the Contract <br /> Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4. 02 of the General <br /> Conditions ; and no additional examinations , investigations, explorations , tests, <br /> reports, studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes . <br /> 7.3 CONTRACTOR has reviewed and checked all information and data shown or <br /> indicated on the Contract Documents with respect to existing underground facilities <br /> at or contiguous to the site and assumes responsibility for the accurate location of <br /> said underground facilities . No additional examinations, investigations, <br /> explorations, tests, reports, studies or similar information or data in respect of said <br /> underground facilities are or will be required by CONTRACTOR in order to perform <br /> and furnish the work at the Contract Price, within the Contract Time and in <br /> accordance with the other terms and conditions of the Contract Documents , <br /> including specifically the provisions of Paragraph 4 . 3 of the General Conditions . <br /> 7.4 CONTRACTOR has correlated the results of all such observations, examinations, <br /> investigations , explorations, tests, reports and studies with the terms and <br /> conditions of the Contract Documents. <br /> 7. 5 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br /> discrepancies that he has discovered in the Contract Documents and the written <br /> resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br /> ARTICLE 8. CONTRACT DOCUMENTS. <br /> The Contract Documents, which comprise the entire agreement between OWNER and <br /> CONTRACTOR concerning the work, consist of the following : <br /> 8. 1 This Agreement (Section 00530) . <br /> 8.2 Performance and other bonds (Sections 00610 and 00620). <br /> 00530 EJCDC - Derrico Construction Corp <br /> 00530-4 <br /> FAUti l lllesWTILIT - ENGWEERINGProjects - Utility Construction Permits\IRC - Hobart I ntluslrlal Park Water Main Extension for Waste Management - MCCaIn\00530 EJCUC <br /> - <br /> Carrico Construction Corp Doc <br />