My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-440
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 12:18:32 PM
Creation date
9/30/2015 11:33:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/18/2007
Control Number
2007-440
Agenda Item Number
7.T.
Entity Name
Florida Power & Light
Subject
Underground Distribution Facilities Installation
Area
West Regional Wastewater Treatment Facility
Project Number
UCP 2621
Supplemental fields
SmeadsoftID
6759
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT " A " <br /> UCD TARIFF ESTIMATE (UCD Tang Effective: 164912064 WRB DATE: 1UMVM7 <br /> PROJECT: '- me p LOCATION: o <br /> DESIGNER <br /> MWIMMMEMMOMWI B OF UNITS BOF UNITS CHARGES CREDITS <br /> (13.242.a) Pnmary lateral Moor ( X from Ovrheterm <br /> ead ination nomas), ped mounted trensfamner and trench with cableinconduit <br /> not to exceed 150 feet for radeds and 300 fast for loops. <br /> (13.2.12.a.i) Single Phase Radial From$983.87 Mead Termination Point From Existing Underground Tennnation Point <br /> (13342x.2) Two phase Radial qty NIA Use Loop Price XN 9ty$A283.J3 X qty NIA UseLoopPnm X <br /> (131.12.a.3) Three Passe Radial - 130KVA $1,16151 X qty NIA Um Looe Dna Xqty(1J.212.a.1) TM1m PM1au Ratlul 300 KVA 5386.01 X qty <br /> NIA Use Loop Prim Xqty(13.2.12a.,5) Single Phase loop $2,290.39 X qtyty <br /> (131.12.a.6) Two Phase Loop $4,363.24 X 4ty $1,489.39 Xqty(10.242.a.7) Thm Phase Loop - 150 KVA $5.761.59 X qty <br /> 3,047.69 X qty(13.2.12a.7) Three Phase Loop - 300 KVA $4,328.68 X qty $4,180.18 Xqtyqtr $2,775.09 Xqty $ - <br /> 03.2.12.1b) Secondary door and lateral, excluding handhole or)unction box, with connection to Applicant's service cables <br /> no greater than 20 feet from Company Moor pole. <br /> (132.126.1) SmallI-arge Single Phase " er than <br /> smeller $453.18 X �Par Naar <br /> (11212.6.2) Large Single Phase larger than 410 TeX $813.18 X per nser $ <br /> (13.212.b.3) Small Three Phase Ola QPX or smaller $641.03 X per nser $ <br /> (13212.bA) Large ThreePhaselar9erthan410QPX $1,261.64 X Writer $ <br /> 03.2.12.0 Small UG commenced services 180 Amp 1201/ 1125 Amp 12WUW per SPO 21010.41 <br /> (13.2.12 c 1 a) 2 win (120V) service on accessible wood pole $53$.93 X Per serycs <br /> (13212c.1.b) 3whe (I=24aV) service on accessible wood pole 3551.95 Xwca <br /> rservl3 - <br /> (13212c2a) 2 wire (120V) sti an inaccessible woad pole $609.88 X per servca $ <br /> (13.2.12.c.2 b) 3 wire (12=40V) service on inaccessible woad pole $623.32 X per cervico $ _ <br /> 113212cle) 2wire (120V) serace on accessible concrete pole $554.03 X per semce $ <br /> Q3 212 c 3 b) 3 wde (I201240V) semce on accessible concreb pole $526.41 X perservice <br /> ce $ _ <br /> (I 3.2.12A) Handholes and Padmoumed Secondary Junction Boxes. excluding connections. <br /> (13.2.124.1) Handholes <br /> (13.2.12d1a) Small W' to dhois30- ha $188.98 X per HH <br /> (1.1.2.12tl16) Intermediate hantlhale $685.56 X �Far HH $ <br /> (131.12.tl1c) Larpe 48' hantlM1ok 5685.83 X per HH $ <br /> (11112tl2) Pad Mounted Junction Bax IPM TX Dummy $1,525.31 X par box $ <br /> Cabinet MSS 016140000-7) <br /> (I3.2.12.d.3A) Pad Mounted Junction Cabinet (22 pori $10,993.11 XOpercalNnet O <br /> 3 phase cabinet MBS 018140640-3) <br /> (I3.2.12.d.3.b) Tapping conductors (if mon than 12 sets) WAS XOper set <br /> (13.212.e) Primary Splice Box including splices and cable pulling set-up <br /> (13212e.1) Single Phase per box $1149.8£ Xper box <br /> (13212.e.2( Two Phase Per box $1,61413 X ®per box $ - <br /> (1 3.2.12.e.3) Three Phase per box $1,785.56 X 1 per box 3 - <br /> $ 1,785.56 <br /> 03.2.12.0 Additional installation change for underground primary laterals Including branch and cablei -contluit which exceeds <br /> the limits sal in 131,12A to reach FPL designated point of delivery. <br /> (13212f.1) Single Phase Per foot $1.97 XperR <br /> 2.$ <br /> (13212) Two Phase Par <br /> per fWin. <br /> foot $4.13 X � <br /> (13 212.$2per) Three Phase foot $ <br /> $1.15 X perft. $ <br /> (13.2.12.8) Additional installation charge for underground primary laterals including trench and cablOmm-oanluit extended <br /> beyond the FPL designated point of dellvery. <br /> (13212g.1) Single Phase Per foot $6.70 X pen ft. _ <br /> (13212.93) Two Phase per foot $10.17 X jpen f6 _ <br /> (13212.g.6) Three Phase Parr foot $12.10 X 480:- - per rt f <br /> ..: $ segfi.00 <br /> (131.12A) UG Feeder <br /> (13.2.12.h) 1000KOMIL (nol Including switch package) $15.37 X per H. <br /> (13 212.h) switch package (813 per package) $21,837.67 X each <br /> (132.12.h) Switch Facings (616perpackage) $21,837.67 X each <br /> S <br /> (13.2.13.a) Trench and backfilling credits <br /> (132.13AA) Credit per foot of Primary trench $360 X 000 par ft. f 1.560.00 <br /> (132.13.a.2) Credit Per foot of secondary trench $243 X peril. g <br /> (13.2.13.10 Conduit installation credits <br /> (192.13.b.1) Cmditperfoatof2' PVO $0.45 X Par ft <br /> (13.2.13.6.2) Credit per root of 5' PVC $0.63 X - 5400 - per lC 1 <br /> (131.13.x1 Handhole I primary splice box installation cretlih <br /> (L3213.c.1) Credit par large HH (gnaater than SW ) I PN Splice Box $174.25 X 1 -IHH(s) I $ 17425 <br /> (13.2.13.c.2) Credit per small l intermediate HIM (30- or less) $45.81 X Hills) I $ <br /> (13.2134) Transfon er I cap bank Pad Installation credits <br /> (13.2.134.) Credit per pad 126.95 XOpad(s) $ <br /> Feeder Spice Box Credit (FDRSPLICEBOX47480) $661.08 Xh <br /> Padmount Switch Chamber Credit (FDNS"ADO7460) $423.05 XEEE]esch $ <br /> AdtliSanal Charges (e.g. non-rapid trenching, restoration, eh.) <br /> TOTAL CONTRIBUTION: f 1593.58 <br /> LESS TOTAL CREDITS: 400,0$ <br /> TOTAL CASH PAYMENT: 3 5103.11 <br /> TOTAL CUSTOMER PAYMENT $ 7593.56 <br /> (CONTRIBUTION MAT + LABOR) $ 2490.23 <br /> (Miscellaneous Trench Purchase must be used 0 credits exceed laded contribution amount Inventory, on wank request was SPO 2145(01) 1 <br /> 11RP6W7 9:21aN (CONTRIBUTION CASH) <br />
The URL can be used to link to this page
Your browser does not support the video tag.