My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-347
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 12:27:47 PM
Creation date
9/30/2015 11:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/09/2007
Control Number
2007-347
Agenda Item Number
11.J.3
Entity Name
Giannetti Contracting Corporation
Subject
Watermain & Forcement Replacement
Bid Award & Sample Agreement
Area
Wabasso Causeway CR 510
Bid Number
2007074
Supplemental fields
SmeadsoftID
6640
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lfS3 <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT, dated the Ill day of (ZtC)beC in the year 2007 by and <br /> between Indian River County, a political subdivision of the State of Florida (hereinafter called <br /> OWNER) and Giannefti Contracting Corporation (hereinafter <br /> called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows: <br /> ARTICLE 1 . WORK <br /> CONTRACTOR shall complete all work as specified or indicated in the Contract Documents. The <br /> work is generally described as follows: <br /> The Contractor shall furnish all labor and materials necessary to construct a new forcemain <br /> and a new watermain along the entire length of the Wabasso Causeway (CR 510). This <br /> construction shall include but may not be limited to all associated tie-ins , piping , valves, <br /> fittings , hydrants, pigging , flushing , site restoration , hauling and disposal of drilling fluids <br /> and cuttings , pressure testing of all piping , bacteriological clearance of the watermain , and <br /> maintenance of traffic in accordance with FDOT standards, as depicted on the drawings <br /> and described in these documents and referenced materials. <br /> The portions of the existing watermain and forcemain parallel to the four causeway bridges <br /> shall be replaced with subaqueous installations. The method the construction of these eight <br /> subaqueous pipe installations shall be horizontal directional drill (HDD ) with 14-inch HDPE <br /> piping . The entire length of all HDD installations is approximately 12 ,610- LF, and shall be <br /> wire line tracked . <br /> The pipe construction between the HDD installations includes approximately 1340-LF of 12- <br /> inch PVC, 500-LF of 8-inch piping , 125-LF 4-inch piping and shall be constructed with a <br /> combination of dig and bury and HDD as depicted on the drawings, in addition to various <br /> segments of smaller pipe necessary to maintain service along this section to the water and <br /> wastewater systems. <br /> CONTRACTOR, as an independent contractor and not as an employee, shall furnish , for the sum <br /> amount of $2,378.000.00 , all of the necessary labor, material , and equipment to perform the <br /> work described above in accordance with the Contract Documents. <br /> ARTICLE 2. ENGINEER <br /> 044572007 <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.