My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-347
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 12:27:47 PM
Creation date
9/30/2015 11:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/09/2007
Control Number
2007-347
Agenda Item Number
11.J.3
Entity Name
Giannetti Contracting Corporation
Subject
Watermain & Forcement Replacement
Bid Award & Sample Agreement
Area
Wabasso Causeway CR 510
Bid Number
2007074
Supplemental fields
SmeadsoftID
6640
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying) all such examinations, investigations, <br /> explorations, tests , reports and studies (in addition to or to supplement those <br /> referred to in Paragraph 7.2 above) which pertain to the subsurface or physical <br /> conditions at or contiguous to the site or otherwise may affect the cost, progress , <br /> performance or furnishing of the work as CONTRACTOR considers necessary for <br /> the performance of furnishing of the work at the Contract Price, within the Contract <br /> Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4 .02 of the General <br /> Conditions; and no additional examinations, investigations, explorations, tests, <br /> reports, studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes. <br /> 7 .4 CONTRACTOR has reviewed and checked all information and data shown or <br /> indicated on the Contract Documents with respect to existing underground facilities <br /> at or contiguous to the site and assumes responsibility for the accurate location of <br /> said underground facilities. No additional examinations, investigations , <br /> explorations , tests , reports, studies or similar information or data in respect of said <br /> underground facilities are or will be required by CONTRACTOR in order to perform <br /> and furnish the work at the Contract Price, within the Contract Time and in <br /> accordance with the other terms and conditions of the Contract Documents, <br /> including specifically the provisions of Paragraph 4 .03 of the General Conditions. <br /> 7 .5 CONTRACTOR has correlated the results of all such observations, examinations , <br /> investigations, explorations , tests , reports and studies with the terms and <br /> conditions of the Contract Documents. <br /> 7 .6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br /> discrepancies that he has is covered in the Contract Documents and the written <br /> resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br /> ARTICLE 8. CONTRACT DOCUMENTS. <br /> The Contract Documents which comprise the entire agreement between OWNER and <br /> CONTRACTOR concerning the work consist of the following : <br /> 8. 1 This Agreement (Section 00530). <br /> 8.2 Performance and other bonds (Sections 00610 and 00620) . <br /> 8.3 Notice of Award and Notice to Proceed. <br /> 8 .4 General Conditions (Section 00700). <br /> 8.5 Supplementary Conditions (Section 00800). <br /> 8.6 Technical Specifications as listed herein the table of contents of these documents. <br /> 044572007 <br /> 00530-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.