My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-336
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2016 10:22:57 AM
Creation date
9/30/2015 9:18:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/04/2005
Control Number
2005-336
Agenda Item Number
11.I.3
Entity Name
CTI Construction, AM Engineering
Ardaman & Associates, Dunkelberger Engineering
Subject
Services Agreements Renewal
Project Number
0534
Supplemental fields
SmeadsoftID
5219
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" ' ll <br /> EX H I BIT <br /> ARDAMAN & ASSOCIATES , INC . <br /> PORT ST , LUCIE OFFICE <br /> 2006 FEE SCHEDULE <br /> FOR INDIAN RIVER COUNTY <br /> ENGINEERING/PUBLIC WORKS DEPARTMENT <br /> CONCRETE SAMPLING AND TESTING <br /> Cylinder samples (4 cylinders per set) : molding , <br /> transporting , curing and strength testing (AS T iii C-31 <br /> and C-39) . Includes one slump (ASTM C- 143 ) and one <br /> temperature determination . Cylinders shall be left in a <br /> place provided by the Contractor, covered with plastic <br /> caps and attempts made to provide shade thereon . If <br /> temperature of the air is critical to first 24 hours <br /> (during field curing ) , equipment to maintain such <br /> controls shall be provided by others (no additional charge for pickup ) $70 . 00/set <br /> Additional cylinders $ 13 . 00/cylinder <br /> Grout Prisms $270 . 00/set of three <br /> Technician time due to construction delays in excess <br /> of 1 . 0 hour portal to portal on the date cylinders <br /> are made . $42 . 00/hour <br /> Technician time $42 . 00/hour <br /> Curing and strength testing samples delivered to our <br /> laboratory (ASTM C-39) $ 12 . 00/cylinder <br /> Continuous monitoring of concrete placement and/or <br /> extra slump and temperature tests , technician time $42 . 00/hour <br /> Slump tests (ASTM C- 143 ) $ 12 . 00/test <br /> Air Entrainment (ASTM C- 173) $22 . 00/test <br /> Unit Weight $28 . 00/test <br /> Yield tests $28 . 00/test <br /> SAMPLING AND TESTING OF IN -PLACE CONCRETE/SOIL CEMENT <br /> Corina and testing of cored samples : <br /> Technician time (two technicians may be required ) $42 . 00/hour/technician <br /> Mobilization of coring equipment: <br /> With power supplied $ 125 . 00/trip <br /> Without power supplied $ 100 . 00/trip <br /> Trimming , capping and strength testing (ASTM C-42 ) $28 . 00/core <br /> Depth measurement $ 12 . 00/core <br /> Pachometer testing : <br /> Mobilization of equipment $50 . 00/trip <br /> Technician time $42 . 00/hour <br /> These prices are in effect for work completed through September 30 , 2006. <br />
The URL can be used to link to this page
Your browser does not support the video tag.