Laserfiche WebLink
Mr. Christopher J. Kafer, Jr., PE <br /> b7/31 /2007 ,(Rev. 8/30/07) <br /> Page 2 of 6 <br /> Task 3 — Permfttfno <br /> Drainage from 17"' Lane SW will be routed to the Falcon Trace stormwater management system via <br /> existing pipe stub-outs along the south side of the roadway. As the Falcon Trace system was designed <br /> to provide treatment and attenuation to the 17"' Lane Roadway Improvements, the proposed <br /> construction may be permitted by a "Letter of Conformance" to the St Johns River Water Management <br /> District. <br /> As described above, the design for this project shall be provided by three (3) consultants. Since our <br /> plans cover a portion of the improvements to be permitted it is anticipated that the County will compile <br /> design plans and stonnwater calculations required to support the Letter of Conformance. We will <br /> therefore provide plans as described below and assist the County in addressing requests for additional <br /> information. <br /> Additional permitting is not included. <br /> Any required permit application fees are not included in this Proposal. <br /> Proiect Schedule and Deliverables <br /> In order to perform our scope of services we will require Kimley-Nom's preliminary four-lane <br /> intersection design of 17°i Lane SW and 27th Avenue, and Knight-McGuire's design of the eastern <br /> portion of 17"' Lane, SW. It shall be the responsibility of the County to ensure these plans are provided <br /> to us in a timely manner. Upon receipt of other consultants' design plans and the County's Notice to <br /> Proceed the project will be performed to the following schedule: <br /> • Kickoff Meeting: Immediately after receipt; <br /> • 90% Plans Submittal: Within 90 days of receipt; <br /> • 100% Plans Submittal: Within 30 days of receipt of County comment on the 90% submittal. <br /> The following deliverables will be provided: <br /> • 90% Plans Submittal <br /> o One ( 1 ) Set of Construction Plans (Hardcopy) <br /> • 100% Plans Submittal <br /> o One (1 ) Set of Construction Plans (Hardcopy, signed and sealed) <br /> o Electronic Copy of the Construction Plans (pdf format) <br /> o Engineer's Cost Estimate <br /> We propose to perform the Scope of Services for the following fees: <br /> Task 1 Route Survey: $ 2, 760. 00 <br /> Tasks 2 - 3 Construction Plans & Permitting: $ 8, 320. 00 <br /> Total : $11 ,080.00 <br /> M <br />