My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-309
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 1:34:07 PM
Creation date
9/30/2015 11:17:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-309
Agenda Item Number
7.P.
Entity Name
Masteller & Moler Inc.
Subject
Services Agreement
Area
17th Lane SW
Project Number
0742
Supplemental fields
SmeadsoftID
6600
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . Drainage Plans : <br /> 1 . Drainage Parameters: Roadway will drain to Falcon Trace Subdivision, on the <br /> south side of 17w Lane S .W. <br /> E. Signing and Pavement Marking Plans <br /> The ENGINEER shall prepare the pavement marking pian layout. All plans are to be <br /> prepared in accordance with the latest design standards and practices (MUTCD), FDOT <br /> Standard Specifications, Indexes, and shall be accurate, legible, complete in design and <br /> drawn at the same scale as the Roadway Plans, furnished in reproducible form. <br /> SECTION IV - TIME FOR COMPLETION <br /> The time for completion of the 90% design drawings for the project shall be ninety (90) days <br /> from notice to proceed. 100% design drawings shall be within 30 (thirty) days of receipt of County <br /> comments on 90% submittal. <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant <br /> to this Agreement fees Lump Sum fee of $ 11 ,080. 00 <br /> SECTION VI - ADDITIONAL WORK <br /> In the event changes are requested by the COUNTY to the contract plans after said plans have <br /> been approved and accepted by the COUNTY or modifications such as additions or deletions, and upon <br /> the issuance of a work order for said additional work by the Director of the Public Works Department, <br /> said additional work may commence in accordance with the fee schedule included in the work order. <br /> SECTION VII - PARTIAL PAYMENTS <br /> The COUNTY shall make monthly partial payments to the ENGINEER based upon a percent <br /> complete of lump sum components, as identified in this Agreement. Payments will be made within forty- <br /> five (45) days of invoice receipt. Payment shall be made pursuant to the Florida Prompt Payment Act, <br /> Florida Statute 218. 70 et seq . <br /> SECTION VIII - EXTRA WORK <br /> In the event extra work is necessary by the ENGINEER due to a change in scope of the project, <br /> such work shall be the subject of a supplemental Work Order approved by the Board of County <br /> Commissioners. The work shall be completed in accordance with the following rate schedule: <br /> Principal of Firm $ 135 .00 <br /> Project Engineer (P.E.) S120.00 <br /> Registered Land Surveyor $ 120 . 00 <br /> Project Manager $ 90. 00 <br /> Inspector $ 65 .00 <br /> Engineering Technician — CADD $ 70.00 <br /> Survey Field Crew $ 115 .00 <br /> Administrative $ 45 .00 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.