Laserfiche WebLink
The existing right-of-way is insufficient for the improvements . The COUNTY is responsible for securing <br /> all right-of-way takes required to construct the improvements . The COUNTY is also responsible for dedicating the <br /> right-of-way required along SR- 5 to the Florida Department of Transportation (FDOT) at no cost to the Department . <br /> SECTION II - COUNTY OBLIGATIONS <br /> The COUNTY agrees to provide (in a timely manner) the following material, data, or services as required in <br /> connection with the work to be performed under this Agreement; all of which information the ENGINEER may use <br /> and reasonably rely upon : <br /> A . The COUNTY shall provide the ENGINEER with copies of all previously conducted studies, <br /> geotechnical investigations, traffic counts and projections, signal phasing and timing, queue lengths , <br /> preliminary data or reports available, existing location surveys, topographic surveys , and related <br /> documents . <br /> B . The COUNTY shall provide the ENGINEER with all available drawings, right-of-way maps , and other <br /> documents in the possession of the COUNTY pertinent to the project . <br /> C . The COUNTY shall be responsible for acquiring all right-of-ways , easements and other rights in land <br /> as necessary to complete the project. <br /> D . The COUNTY shall be responsible for dedicating all acquired right-of-ways along SR-5 , required for <br /> the improvements, to the FDOT at no cost to the Department. <br /> E. The COUNTY shall make provisions for the ENGINEER to enter upon public and private property as <br /> required for the ENGINEER to perform his services . <br /> F . The COUNTY will promptly execute all permit applications and provide application fees necessary to <br /> expedite the acquisition of any local, state or federal permits made necessary by the project. <br /> G . The COUNTY shall provide all abstracts of title for each parcel necessary for the construction . <br /> H . The COUNTY shall be responsible for preparing the specification package, bid package, advertising <br /> the project to bid, scheduling the pre-bid meeting, collecting bids, and awarding the project to the <br /> selected contractor . <br /> 2 <br />