My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-170
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:37:12 AM
Creation date
9/30/2015 8:47:05 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C . Geotechnical Investi ag tion <br /> The ENGINEER will provide geotechnical engineering services on this project including a review <br /> of existing information, field reconnaissance, roadway coring, Standard Penetration Test (SPT) <br /> boring and auger borings . The scope of service described below has been requested by the client. <br /> The requested scope of service for the proposed intersection improvement project will include the <br /> following : <br /> 1 . Perform up to 12 five-foot auger borings within the areas that are proposed to be widened to <br /> explore the shallow soil stratigraphy. The borings will be performed using a 3 - inch diameter hand <br /> (bucket) auger. <br /> 2 . Perform up to six roadway cores . The cores will be conducted using a 4- inch diameter diamond <br /> tipped core barrel . The thicknesses of the individual pavement components will be measured and <br /> the core holes will be backfilled and patched upon completion . <br /> 3 . Perform two SPT borings at the proposed mast arm locations to a depth of approximately 35 feet . <br /> The SPT borings will be drilled using a procedure similar to the Standard Penetration Test outlined <br /> in ASTM D- 1586 . The borings will be sampled at 18 -inch to 24-inch intervals to 10 feet deep and <br /> at 5 -foot intervals below 10 feet. <br /> 4 . Obtain soil samples from the auger borings for laboratory testing. This includes routine <br /> classification tests including standard sieve analysis , Atterberg Limits , organic contents, etc . <br /> 5 . Prepare a report including all data developed during the laboratory and field programs , and our <br /> recommendations relative to soil and groundwater parameters to be used in the design . <br /> D . Roadway Design Plans <br /> Design plans shall be prepared to include : <br /> 1 . Key sheet with location map <br /> 2 . General Notes <br /> 3 . Horizontal and Vertical Control <br /> 4 . Typical Sections <br /> 5 . Plan and/or Profile sheets <br /> 6 . Grading Plans <br /> 7 . Summary of Quantities <br /> 8 . Summary of Drainage Structures <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.