or be provided if feasible . Sidewalks shall be added to the north side of 0 Street SW to tie into the existing <br /> sidewalk on the west side of 27`h Avenue . A convertible flasher/traffic signal with mast arms and <br /> horizontally mounted signal heads will be installed with internally illuminated signs . Additionally, video <br /> detection on each approach and one surveillance camera will be installed. Signal interconnect conduit is to <br /> be provided for the entire length of the project. <br /> 2 . 5 `}' Street SW and 27d' Avenue — Currently this intersection is a 4-way signalized intersection with signals <br /> mounted on span wires . The east and west approaches are curbed, 3 lane, urban sections with left-turn lanes <br /> and posted speeds of 40 mph and 35 mph respectively. The north and south approaches are 3 (narrow) lane <br /> rural sections with 4 ' paved shoulders and a posted speed of 40 mph . Type F curb and gutter will be <br /> extended for 500 feet from the intersection on the north and south approaches . Twelve foot ( 12 ' ) left turn <br /> lanes and widened through lanes will be added to the north and south approaches requiring approximately <br /> 500 feet of widening plus required transitions to the west side of said approaches . An Indian River Farms <br /> Water Control District (IRFWCD) sublateral canal runs along the south side of 5t' Street SW, which will <br /> require some regrading due to the new curb and gutter. Guardrail will also be installed in any areas with <br /> drop-off hazards within the project limits (500 feet each approach plus required transitions) as approved by <br /> IRFWCD . Paved shoulders shall remain or be provided if feasible . Sidewalks shall be added to the west <br /> side of 27th Avenue and high emphasis crosswalks shall be used due to the nearby school . A convertible <br /> flasher/traffic signal with mast arms and horizontally mounted signal heads will be installed with internally <br /> illuminated signs . Additionally, video detection on each approach, and one surveillance camera will be <br /> installed . Signal interconnect conduit is to be provided for the entire length of the project. <br /> 3 . 1 " Street SW and 43 `d Avenue — Currently this intersection is a 2-way (east/west) stop controlled <br /> intersection . The east approach is a 2 lane rural section with a posted speed of 35 mph while the west <br /> approach is a curbed, 2 lane, urban section with a posted speed of 35 mph . The north and south approaches <br /> are 3 lane rural sections with 4 ' paved shoulders, left turn lanes and a posted speed of 35 mph. Left turn <br /> lanes will be added to the east and west approaches requiring approximately 500 feet of widening plus <br /> required transitions to the north side of said approaches. A large Indian River Farms Water Control District <br /> (IRFWCD) sublateral canal is located on the south side of I " Street SW . The ditch will be filled with a <br /> large culvert and earth or regraded to facilitate the widening. Curb and Gutter will be installed along all <br /> approaches within the project limits ( 500 feet each approach plus required transitions) . Guardrail will also <br /> be installed in any areas with drop-off hazards as approved by IRFWCD . Paved shoulders shall remain or <br /> be provided if feasible. Sidewalks shall be added to the north side of I " Street SW to tie into the existing <br /> sidewalk on the east side of 43 `d Avenue . A traffic signal with mast arms and horizontally mounted signal <br /> heads will be installed with internally illuminated signs . Additionally, video detection on each approach <br /> and one surveillance camera will be installed . Signal interconnect conduit is to be provided for the entire <br /> length of the project. <br /> 2 <br />