My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-223
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 12:08:05 PM
Creation date
9/30/2015 8:54:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/21/2005
Control Number
2005-223
Agenda Item Number
11.I.3
Entity Name
Orchid Landing, L.L.C. WCI Communities, Inc.
Subject
CR 510 Widening & Intersection Improvements
Area
Orchid Landing
Supplemental fields
SmeadsoftID
5033
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . The COUNTY agrees to design and construct the following roadway and <br /> intersection improvements : <br /> A . Expansion of the existing two lane road to add two additional lanes <br /> ( for a four lane divided section) on County Road 510 , between the FEC Railroad and the <br /> Wabasso Bridge , a distance of approximately 3 , 000 linear feet, including transitions , <br /> project site-related turn lanes , and signalization at the CR 510/Orchid Landing entrance <br /> (if warranted and approved by the Florida DOT since CR 510 has recently been <br /> transferred to the State of Florida) . Said improvement shall include the construction of <br /> dual left turn lanes , two through lanes and a right turn lane on all four approaches to the <br /> CR 510/US 1 intersection, including necessary transitions to the portions of the existing <br /> CR 510 roadway and signalization for the CR 510/US 1 intersection . All of the foregoing <br /> items are collectively known as the "Road Improvements " . The estimated cost of the <br /> above improvements , based on an estimate from Kimley- Horn & Associates and <br /> approved by COUNTY, is Three Million Nine Hundred Seventy Nine Thousand Eight <br /> Hundred Fifty Nine Dollars ( $ 3 , 979 , 859 . 00) . When construction drawings are 60 % <br /> complete , a copy will be made available to the DEVELOPER for design of water, sewer <br /> and applicable project utilities . The project will be designed by McMahon and <br /> Associates , Inc . , Engineer for the County. <br /> Be COUNTY shall be responsible for all costs associated with obtaining <br /> the right- of-way for the Road Improvements . DEVELOPER and OWNER shall use their <br /> best efforts to assist the COUNTY in the right- of-way acquisition , including stormwater <br /> 6/ 15/2005 - 10 : 03 AM 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.